Comparison between field monitoring and calculated settlement for railway embankment built on peat

Relevanta dokument
Vegastaden Dpl 2 Haninge kommun

Södra Infarten Halmstad Vägutredning

Storängens industriområde inom Huddinge Kommun

Översiktlig geoteknisk utredning inför nyetablering av hotell i Hallunda, Botkyrka kommun.

KARLSSONS ÄNG, KALMAR Detaljplan. Översiktlig geoteknisk utredning

Kungsbacka. Detaljplan för del av Åsa 3:303 & 3:205. Geoteknisk utredning för detaljplan

Peaty ground- made for mass stabilization

Tekniskt PM angående geoteknik undersökning för upprättande av detaljplan för nybyggnation av bostäder

Delområde bebyggelse Söderhamn

Översiktlig geoteknisk utredning för detaljplan vid Björkängen, Torsby kommun Värmlands län

Fjällbacka 187:44 och 187:47 Geoteknisk undersökning PM Geoteknik

PM Geoteknik Österhagen

PM GEOTEKNIK SUNDSÄNGEN SYDNÄRKES BYGGFÖRVALTNING SWECO CIVIL AB HANDLÄGGARE VIKTOR KARLSSON GRANSKARE LARS MALMROS UPPDRAGSNUMMER

PLANERINGS PM/GEOTEKNIK

Nya Kungälvs sjukhus, PM Geoteknik Utlåtande kring stabilitetsförhållanden vid planerad byggnad, Hus 19. Innehållsförteckning

RAPPORT SANERING JÄRNSÅGEN 3, TROLLHÄTTAN BEDÖMNING AV SÄTTNINGAR VID GRUNDVATTENSÄNKNING SWECO CIVIL PER LAGER. Sweco

DETALJPLAN FÖR SKOLAN 2 M FL, LYCKEBY

PM Geoteknik DEL AV FÖRSTUDIE FÖR NORRA STADSOMRÅDET, LASSABACKA EKMARK LENA

Borgviks hamnområde, Grums kommun

Vegastaden Dpl 2 Haninge kommun

PM Geoteknik Geoteknisk förstudie för detaljplaneskede

Stora Sköndal Konsekvensbeskrivning Geoteknik

FÄRGELANDA KOMMUN DYRTOPR 1:3 M.FL (DEL AV) Detaljplan. Geoteknisk utredning

2:497, Öckerö Geoteknisk utredning: PM beträffande detaljplan

Dalvägen genom Dalkarlsängen Södra

Håby-Lycke 1:53 mfl, Munkedals kommun. PM Ändring av gällande detaljplan Geoteknik Upprättad av: Per Friberg Granskad av: Per Friberg

Väg 222, tpl Kvarnholmen

Teknisk PM Geoteknik. Detaljplan Hällebäck. Stenungsund

Rörtången. Utökad undersökning, Geoteknik

Stafsinge 3:6 m.fl. Falkenberg - detaljplan Teknisk PM Geoteknik

DETALJPLAN FÖR SÖRMARKEN, BANKBUDET 5, BORÅS STAD

Teknisk PM Geoteknik. Detaljplan för Ättehögsgatan Göteborgs kommun. PMGeo

ALINGSÅKER ETAPP 1, TROLLHÄTTAN

PM GEOTEKNIK ALMAREVÄGEN

PM Geoteknik. Förprojektering i samband med detaljplanearbetet vid Torsboda kombiterminal Reviderad

TJÖRNS KOMMUN HÖVIKSNÄS. Geoteknisk utredning

Väg 161 Delen Bäcken - Rotviksbro

Kungsbacka kommun Åsa centrum Översiktlig geoteknisk undersökning för planprogram

PM/GEOTEKNIK - PLANERINGSUNDERLAG

RAPPORT KARLSTADS KOMMUN KARLSTAD, JAKOBSBERGSOMRÅDET FYLLNING OCH MASSHANTERING UPPDRAGSNUMMER FÖRSTUDIE

Tekniskt PM Geoteknik. E20 förbi Vårgårda. Vårgårda kommun, Västra Götalands län. Vägplan: Projektnummer:150305

PM Geoteknik Lommarstranden

KARLSHAMNS KOMMUN Kungsparken, Mörrum Detaljplanen för del av Mörrum 73:1 & 73:4 m.fl. Översiktlig geoteknisk utredning

Härryda kommun, Förskola Önneröd PM beträffande geotekniska förhållanden

PM Geoteknik Skiljebo (Västerås 3:28) Västerås Stad

PM Planeringsunderlag Geoteknik Stretered 1:191, Mölndal stad Mölndal stad

Upplands-Bro kommun Örnäs 1:1, Kungsängen Golf och Rekreation

"Nordöstra Kungsbacka" Geoteknisk PM - underlag till planprogram

Detaljplan del av Duvehed, Fjärås Kungsbacka kommun Geoteknisk utredning

OBJEKTSPECIFIK TEKNISK BESKRIVNING VÄG, GEOTEKNIK OTBv/geo

Kärr 1:8 Stenungsund. Geoteknisk utredning PM planeringsunderlag

Geoteknisk PM Detaljplan

Del av Kännestorp 2:25 Spekeröd, Stenungsunds kommun Detaljplan för förskola Geoteknik Utvärderingar och bedömningar PM Arb.

Geoteknisk utredning PM Planeringsunderlag. Detaljplan Malmgården Flässjum 1:7, 1:8 och 1:34 Bollebygd Kommun

RAPPORT Nya bostäder på Styrsö 1:104 m fl Geoteknisk PM - planeringsunderlag

Del av fastigheterna Bua 4:94, Bua 10:108 och Bua 10:248

PM GEOTEKNIK TÅSTORP 7:7 M.FL FALKÖPINGS KOMMUN JÖNKÖPING GEOTEKNIK SWECO CIVIL ÖVERSIKTLIG GEOTEKNISK UNDERSÖKNING INFÖR DETALJPLAN

Detaljplan för verksamheter vid Säve stationsväg, inom stadsdelen Säve

Geoteknisk PM Detaljplan

KVASTMOSSEN, DJURHULT 1:5 M.FL. FASTIGHETER, NYBYGGNAD KOMBITERMINAL. Översiktlig geoteknisk utredning

Filsbäck Lidköpings kommun Eventuella detaljplaner Geoteknik Utvärderingar, beräkningar och bedömningar PM Arb.nr 16097

Detaljplan PM Geoteknisk utredning

Väg 163, Planerad GC väg i Grebbestad. PM Geoteknik. Datum:

ÖVERSIKTLIG GEOTEKNISK UNDERSÖKNING

DEL AV TORSTÄVA 13:9. PM Översiktlig geoteknisk utredning KARLSKRONA KOMMUN

Geoteknisk utredning, Evensås. Stätten Gård AB

Rev. A Stugsund, fd impregnering Söderhamns kommun. Geoteknisk undersökning. PM. Handläggare: Mats Granström

Rörelser och portryck vid kalkpelarinstallation. Redovisning av mätresultat. Åke Johansson

Kv Tjädern 17 Kungsbacka kommun Teknisk PM Geoteknik. Underlag för detaljplan

Linköpings Kommun. Norrberga 1:294 och del av Sturefors 1:4 inom norra Sturefors. Översiktlig geoteknisk undersökning.

Veddesta 2:81, Järfälla kommun

Geotekniskt PM 1 - Planeringsunderlag. Översiktlig geoteknisk undersökning för detaljplan Glänninge sjö, Laholm

Väg 156, stigningsfält, Skoghem Backadal

Baerum kommune. Geoteknisk rapport. Rud, Baerum kommune. Rapport nr Oppdragsnr.:

Lastspridande lätt platta med Leca lättklinker. Exempel på sättnings- och stabilitetsberäkningar för väg på torv

PM Geoteknik. Upplands-Bro. Galoppbana. Projekteringsunderlag. Förhandskopia

Väg E6 Helsingborg-Halmstad, Trafikplats Rebbelberga

PM GEOTEKNIK. DPL Södertälje syd KILENKRYSSET BYGG AB UPPDRAGSNUMMER THOMAS REBLIN. repo001.docx

Projekterings-PM / Geoteknik

1 Bakgrund/syfte Område Geologi Befintlig byggnation... 3

GEOTEKNISK UTREDNING: PM FÖR DETALJPLAN

ÖVERSIKTLIG GEOTEKNISK UNDERSÖKNING SAMT RADONMÄTNING AVSEENDE NY DETALJPLAN

Kungälv / BOKAB Tega 2:5, Detaljplan Geoteknisk undersökning: PM beträffande geotekniska förhålllanden

SYDÖSTRA KUMMELNÄS (OMRÅDE G)

Kungsbacka, Aranäs sporthall, Detaljplan

Kv Porfyren 2. Projekterings-PM/Geoteknik. Kartåsen, Lidköping Detaljplan BOHUSGEO AB. Uppdragsansvarig: Henrik Lundström.

Bergsvik delområde 4 Munkedals kommun Detaljplan Geoteknik Utvärderingar, beräkningar och bedömningar PM Arb.

Bestämning av egenskaper i cellstabiliserad torv. Nenad Jelisic Torbjörn Edstam Yvonne Rogbeck

Projekterings PM, Geoteknik Samrådshandling Projektnummer:

PM Geoteknisk undersökning för detaljplan

KC-pelarförstärkning av instabil slänt. E4, delen Nyland - Ullånger, Västernorrlands län. Åtgärder och mätningar.

Geoteknisk PM Detaljplan. Del av Vara 26:1 Vara, Vara kommun PROJEKTNR: Datum:

RAPPORT ÅRJÄNGS KOMMUN SVENSBY STRAND, ETAPP 2, ÅRJÄNG GEOTEKNISK UNDERSÖKNING FÖR NY DETALJPLAN UPPDRAGSNUMMER

Hövik 3:23. Projekterings-PM/Geoteknik. Höviksnäs, Tjörns kommun Släntstabilitetsutredning BOHUSGEO AB. Uppdragsansvarig: Henrik Lundström

DETALJPLAN FÖR DEL AV FLÄSSJUM 4:97 ODINSLUNDSVÄGEN, BOLLEBYGD

ÅRJÄNGS KOMMUN SILBODALSKOLAN STABILITET MOT SILBODALSÄLVEN GEOTEKNISK UTREDNING PM GEOTEKNIK. Örebro

Detaljerad stabilitetsutredning

TORSBY KOMMUN KV STÄDET 2 PLANERADE BOSTADSHUS GEOTEKNISK UTREDNING TEKNISK PM GEOTEKNIK. Örebro WSP Box Örebro

Teknisk PM Översiktliga geotekniska förutsättningar. Växthuset 1 samt Växthuset 2. AR Pedagogen Park AB. GeoVerkstan

JAKOBSBERG 1:1 M.FL., KALMAR DETALJPLAN. Översiktlig geoteknisk utredning Upprättad av: Daniel Elm Granskad av: Torbjörn Johansson

Transkript:

NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Comparison between field monitoring and calculated settlement for railway embankment built on peat Ulrika Isacsson WSP Sverige AB, Sweden, ulrika.isacsson@wspgroup.se ABSTRACT On the part Rydbo Åkers Runö, North East of Stockholm, the narrow gauge railway Roslagsbanan have during the later years been expanded with a second track. The original railway was built during the beginning of the 20th century. The ground at the part km 21+720 21+920 consists of a wood covered marsh, a.k.a. Igelkärret. The soil generally consists of an upper layer of ca 2 m medium decayed to decayed peat and mud, resting on soft clay down to at most 15 m below the ground surface. The new track is located on the south side of the existent embankment, with 4,5 m between the tracks. The height of the embankment is 3 5 m. Both the old and the new tracks are reinforced with lime-cement columns and expanded clay. There are also loading berms on each side of the embankment. The settlement of the reinforced embankment, both the original embankment and the new embankment, as well as the loading berms resting directly on the peat have been monitored for a period of 1,5 years. The settlement of the embankment situated on the lime cement columns were calculated by means of Excel. The settlement of the loading berms resting on the peat have been estimated according to the diagrams in SGF Information 6. These results have been compared to the measured settlement to determine the accuracy of the calculation methods both in terms of the resulting settlement and during which period of time it took place. Keywords: sättning, KC-pelare, torv, järnväg 1 BAKGRUND Järnvägen har på aktuell sträcka, xxx, byggts ut från enkelspår till dubbelspår. Ursprunglig järnvägsbank byggdes i början av 1900-talet och ny järnvägsbank färdigställdes 2014. Det nya spåret har förlagts på södra sidan utmed det befintliga spåret med 4,5 m spåravstånd. Banken är 3 5 m hög. Terrängen består av ett kärr, Igelkärret, som är skogsbevuxet. Järnvägen korsar kärret i öst-västlig riktning. Marken är generellt sett plan. 2 FÖRUTSÄTTNINGAR 2.1 Jordlagerföljd Den naturliga jorden utgörs av torv och gyttja på lera ovan friktionsjord som vilar på berg. Jorden består överst av mellan 1 2 m medel- till högförmultnad torv. Torven underlagras generellt av mellan 1 2 m gyttja. Lerans mäktighet varierar mellan 3 och 12 m. Djupet till fasta jordlager är som mest ca 15 m. 2.2 Grundvatten och portrycksförhållanden På sträckan finns installerat en portryckstation och ett grundvattenrör. IGS 397 NGM 2016 - Proceedings

Investigation, testing and monitoring Grundvattenröret visar på hydrostatiskt tryck i friktionsjorden under leran, med en nolltrycksnivå strax under markytan. Portrycket på 10 m djup har vid mättillfällena varierat mellan 63 och 95 kpa. På 5 m djup har portrycket uppmätts till mellan 40 och 45 kpa. 2.3 Konsolideringsförhållanden För den jungfruliga marken bedöms leran vara normalt konsoliderad till svagt överkonsoliderad (OCR 1,2 1,4). Under befintlig järnvägsbank har leran konsoliderat i över 100 år. Den ökade konsolideringsgraden har bedömts enligt Stabilitet för befintliga järnvägar (BVS1585.002) och visar på en ökning av σ c med ca 85 kpa.. 2.4 Förstärkningsåtgärder Geotekniska förstärkningsåtgärder har utförts för både ursprunglig och ny järnvägsbank. Förekommande organisk jord ovan leran har skiftats ur och marken har förstärkts med kalkcementpelare installerade i skivor. Jordförstärkningen kombineras med 2 m lättklinkerfyllning i järnvägskroppen samt 1 m höga tryckbankar på vardera sidan av banken, se Figur 1. I övergången mot fastmark i väster och i öster, där kalkcementpelarna blir för korta, skiftas all lös jord ut. Då torven i området har en relativt låg vattenkvot innebär detta att den pålagda lasten om ca 20 kpa resulterar i en bedömd deformationssgrad om ca 15 20%. Med en torvtjocklek om 1,5 2 m innebär detta ca 40 cm sättning som till största delen utvecklas inom 1 2 månader med belastning. 3.2 Sättningar i KC-pelare Sättningsberäkningarna och kontroll av kryplasten för den kalkcementförstärkta delen av jorden är utförda enligt SGF Rapport 2:2000 med hjälp av excel. Jorddjupet varierar längs med sträckan. Redovisad sättningsberäkning är utförd för en typsektion med bankhöjd ca 3 m samt jorddjup ca 10 m. För resultat av sättningsberäkning för bank på jungfrulig mark, se Figur 2. För resultat av sättningsberäkning för bank på tidigare belastad mark, se Figur 3. 4 OBSERVERADE SÄTTNINGAR Det har placerats ett antal peglar på banken och tryckbanken. Peglarna har beteckningar P och OR, för planläge se Figur 4. Figure 2 Peglar km 21+740 21+880. Figure 1 Typsektion för geoteknisk förstärkningsåtgärd. 3 BERÄKNADE SÄTTNINGAR 3.1 Sättningar i torv Sättningsuppskattning för tryckbankar på torv har utförts enligt SGI Information 6, Torv geotekniska egenskaper och byggnadsmetoder. Arbetet med järnvägsbanken samt den södra tryckbanken slutfördes i maj 2014. Arbetet med den norra tryckbanken slutfördes i juli 2014. Krönpeglarna på banken installerades i juni 2014 och peglarna på tryckbankarna installerades i juli 2014. Samtliga peglar har avlästs kontinuerligt, men med tidsintervall som varierat under mätperioden. Se sättningskurvor för södra bankdelen i Figur 5 samt för norra bankdelen i Figur 6. NGM 2016 - Proceedings 398 IGS

Comparison between field monitoring and calculated settlement for railway embankment built on peat Figure 3 Beräknad sättning inom KC-pelare under ny järnväg (södra banken). Figure 4 Beräknad sättning inom KC-pelare i tidigare belastad jord (norra banken). IGS 399 NGM 2016 - Proceedings

Investigation, testing and monitoring Figure 5 Sättningskurvor Södra banken. Figure 6 Sättningskurvor Norra banken. Figure 7 Sättningskurvor tryckbankar. NGM 2016 - Proceedings 400 IGS

Comparison between field monitoring and calculated settlement for railway embankment built on peat 5 RESULTAT Beräknad sättning för den norra banken är efter 1 år ca 10 cm, med den största delen av sättningarna utvecklade efter 2 till 3 månader. Uppmätt sättning för samma bank är efter 3 månader ca 2 till 5 cm, samt efter 1 år ca 2 till 9 cm. Beräknad sättning för den södra banken är efter 1 år ca 16 cm, med den största delen av sättningarna utvecklade efter 2 till 3 månader. Uppmätt sättning för samma bank är efter 3 månader ca 6 till 12 cm, samt efter 1 år ca 10 till 16 cm. Bedömd slutsättning för tryckbankar på torv uppgår till ca 40 cm, med i princip all sättning utvecklad efter 1 à 2 månader. Efter 2 månader är den uppmätta sättningen ca 5 till 20 cm och efter 1 år ca 8 till 35 cm. 6 SLUTSATS För de beräknade sättningarna för både norra och södra banken, uppnåddes slutsättning inom ett år. I sättningskurvorna för krönpeglar på bank har den beräknade slutsättningen ej överskridits efter 1 år av mätningar, men kurvorna visar en variation avseende utplaningen på sättningen. Att de uppmätta sättningarna även visar en variation avseende storleken på sättningarna bör till viss del bero på att både banktjocklek och jorddjup varierar på sträckan, gentemot vad som antagits i beräkningarna. Efter 2 månader har ca 60% av den uppmätta 1-årsättningen på tryckbankarna utbildats. Även här visar sättningskurvorna en variation avseende utplaning på sättningen. Anledningen till den långsammare utbildningen av sättningar kan exempelvis bero på att torvens egenskaper och mäktighet varierar över sträckan. IGS 401 NGM 2016 - Proceedings

Investigation, testing and monitoring NGM 2016 - Proceedings 402 IGS