Erfarenheter och lärdomar från drift och underhållsarbete



Relevanta dokument
Varför Vind? GENERAL PRESENTATION

Acquisition of two Shoppingcenters: Hamm

Others 9.2 % Nordex 4.3 % Senvion (RePower) 4.3 % Frisia 5.1 % Enercon 42.6 % Siemens/ AN Bonus 11.0 % Vestas/NEG Micon 23.5 %

SKF i framtidens vindkraft. Tobias Finndin Energy Segment Business Manager SKF Regional Sales and Services - Sverige

Repowering, Life-Time-Extension, Renovering

Outsourcing - Från teknikfokus till verksamhetsfokus Cristian Conteras Cramo AB Infrastructure Architect cristian.contreras@cramo.

Regionala Närningslivet & Siemens

NORDIC GRID DISTURBANCE STATISTICS 2012

EN BÄTTRE BALANS MED SVAGT SJUNKANDE TRÄVARUPRISER 2015 OCH EN NY PRISUPPGÅNG I MITTEN AV 2016

EN BÄTTRE BALANS MED SVAGT SJUNKANDE TRÄVARUPRISER 2015 OCH EN NY PRISUPPGÅNG I MITTEN AV 2016

Preliminär elmarknadsstatistik per månad för Sverige 2014

EN BÄTTRE BALANS MED SVAGT SJUNKANDE TRÄVARUPRISER 2015 OCH EN NY PRISUPPGÅNG I MITTEN AV 2016

Solar eclipse (Friday)

Näringslivstillväxt inom vindenergin. Matthias Rapp Svensk Vindenergi

.SE (Stiftelsen för Internetinfrastruktur) Presentation November 2009

PRODUCT MANAGEMENT. Klicka här för att ändra format. Klicka här för att ändra format på underrubrik i bakgrunden

OX2 GLÖTESVÅLEN WIND FARM BY OX2 FEB 2015

DE TRE UTMANINGARNA..

Ett energisystem med större andel vindkraft. Johnny Thomsen, Senior Vice President Product Management Vestas Wind Systems A/S

Field Services. Industriautomation. Service och modernisering

The road to Recovery in a difficult Environment

Optimera underhållet och maximera livslängden

Bättre logistik och vindkraft i kallt klimat

Vindforsk IV update of ongoing projects

WAVES4POWER Fosnavåg 24 oktober 2016

SOLAR LIGHT SOLUTION. Giving you the advantages of sunshine. Ningbo Green Light Energy Technology Co., Ltd.

Den Disruptiva Utmaningen. Christian Sandström, Tekn Dr. Chalmers och Ratio. Disruptive, Computer Sweden 16 oktober 2014

Den Danske Bank in Sweden

Wood Buildings. -Development in Sweden Niclas Svensson, Swedish Wood Building Council. Niclas Svensson, Swedish Wood Building Council

Fujitsu Day in Action. Human Centric Innovation. En resa mot tillväxt Santa Maria. Stefan Johansson. 0 Copyright 2016 FUJITSU

EU:s investeringar post 2020

Svensk presentation Anita Lennerstad 1

Rapporter, blanketter och hantering av interna mellanhavanden. 19 maj, 2011 Senior Group Controller

2016, Arbetslösa samt arbetslösa i program i GR i åldrarna år

Preliminär elmarknadsstatistik per månad för Sverige 2014

Analys och bedömning av företag och förvaltning. Omtentamen. Ladokkod: SAN023. Tentamen ges för: Namn: (Ifylles av student.

Hur du utvecklar ditt företag med Unified Communications Per Björklund, Efftel,

Field Services. Elkraftservice. Service och modernisering

Egen el från vind Sven Ruin

A G@16 January 2011 WORRIES, DIRECTION and SATISFACTION

Indikatorer för utvecklingen av de Europeiska energisystemen

SKF smörjsystem. SKF/ToolsMomentum Vindkraftsdag Janne Westerlund, SKF Lubrication Competence Centre

Från N 1-kriteriet till en planering och drift av kraftnätet, grundad på sannolikheter

Signatursida följer/signature page follows

E.ON Serviceerbjudande Drift och underhåll av vindkraft

E4 Sundsvall Sundsvallsbron

Båtbranschstatistik. Boating Industry Statistics SWEDISH MARINE INDUSTRIES FEDERATION

MAY 11, 2017 PRESENTATION CARNEGIE

Kunskapsintensiva företagstjänster en förutsättning för en konkurrenskraftig industri. HLG on Business Services 2014

TIPS TILL BLIVANDE ENTREPRENÖRER

Aditro Our focus benefits yours Molnet -- Presentation

Metaller: behov, produktion och priser från ett. nordisk perspektiv. Norges Geologiska Undersökning. Per Storm. Trondheim 5 februari 2009

Välkommen till Ålandsbankens bolagsstämma 2015

Piteå. Welcome to. Piteå. The New Energy Center in Europe

Presentation of the Inwido Group

Utvecklings- och tillväxtplan för ett hållbart Åland

Alstom Power Sweden AB

Gröna bränslen för tunga dieselfordon Patrik Thärnå

Gävle. CCIC, Innovative Cities Svenska Kommun Försäkrings AB Nidaros Forsikring. (Swedish Municipality Insurance Co Ltd)

IKEA Food Supply / Inter IKEA Group

Purchasing Managers Index Services

Certifikat. Detta certifikat intygar att. Moelven Årjäng Såg AB

Riskhantering. med exempel från Siemens

TOUCH POINTS AND PRACTICES IN THE SMART GRID

Purchasing Managers Index Services

Driftrapport WEC 4015,

MAY 9, 2018 PRESENTATION REMIUM

Materialplanering och styrning på grundnivå. 7,5 högskolepoäng

Bonds have more fun Peter Hjalmarson, Group Treasurer, Getinge AB. Fokusgrupp Treasury. 24 Maj, 2013

Bioenergi Sveriges största energislag!

Commission Regulation EU 2018/1142

The Municipality of Ystad

Försäljning möt kunden öga mot öga. Seminarium 1 mars, Välkommen!

Purchasing Managers Index Services

Produktionslogistik i den Smarta Fabriken

Välkommen till IFS Skandinaviska Användarförening ANVÄNDARKONFERENS.

Preliminär elmarknadsstatistik per månad för Sverige 2013

Olof Sand CEO & President

Purchasing Managers Index Services

European Spallation Source (ESS) från Projektmodeller till Plant/Product Lifecycle Management

WAVES4POWER Ludvika

Homes in Stockholm. Zdravko Markovski, Business Unit Manager, JM Residential Stockholm and JM Property Development

Tunga metaller / Heavy metals ICH Q3d & Farmakope. Rolf Arndt Cambrex Karlskoga

Supplier of complete biofuel installations

Past 60 weeks. Prior period. 10 resp 90% probability, Past 60 weeks. Prior period. Max/min. Average,

Botnia-Atlantica Information Meeting

CIO MÖTE OSLO 17/11 INFORMATION // INTELLIGENCE // ADVICE. Radar Ecosystem Specialists

William J. Clinton Foundation Insamlingsstiftelse REDOGÖRELSE FÖR EFTERLEVNAD STATEMENT OF COMPLIANCE

The current state of the VC industry in relation to other financing sources for startup firms

SharePoint 2010 licensiering Wictor Wilén

Fundament. till vindkraftverk. terraform europe

Avkastning Premiepension Bas sedan starten

BTS Group AB (publ) Annual General Meeting 2016 Stockholm, May 10, 2016

Bilaga 23 Kompletteringar till MKB Ha lsingeskogens vindkraftpark

SAMMANFATTNING AV SUMMARY OF

Hittsjön. Vindkraftspark. Samrådsunderlag

Fokus för WWFs svenska energiarbete idag

Managing addresses in the City of Kokkola Underhåll av adresser i Karleby stad

Solvina. - Energy Excellence - Our goal, your benefit

PILOTPROJEKT VINDKRAFT BRUNSMO KARLSKRONA KOMMUN

Transkript:

Erfarenheter och lärdomar från drift och underhållsarbete Gert-Olof (Måns) Holst, CEO eno energy Sweden 1010

Page 2 Agenda 1. eno energy 2. Erfarenheter och lärdomar från drift och underhållsarbete

1. eno energy eno energy Facts and Figures Page 3 Founded in: 1999 Structure: Owner-managed company Total staff: 186 References: 237 wind turbines, in total 300.6 MW realized, - 41 eno wind turbines, in total 84.95 MW - Pipeline: 400 MW planned Located: Germany, Sweden, France Business areas: Wind turbine production, Site evaluation, design of wind farms, sales and financing, Management, Service and Maintenance

Page 4 1. eno energy Timeline Installation of prototype eno 92 Founded as a project planner 1999 2003 Top 5 of wind turbine manufacturers Roll out of 3.5 MW platform, eno 114 200 MW project volume realized Top 7 of installed wind farms in Germany Start of development of eno wind turbines 300 MW project volume realized Launch of Service Point in Leipzig 2007 2010 2012 100 MW realized 2008 2011 Offices in Berlin, Hamburg, Stuttgart Market entry France Foundation eno energy Sweden AB Installation of first prototype of Initial operation and sale of the first French wind farm Roll out of eno EBikes First Corporate bond IPO Erection of first eno 92 in Sweden Erection of first eno 100 in Sweden

1. eno energy Turnover and EBIT Page 5 100 80 81.8 million 60 40 20 51.4 40.9 24.2 4.7 4 5.7 9.8 EBIT Turnover 0 2009 2010 2011 2012 Employees (ar 31.12.) 65 81 87 122 Major focus has been put on healthy growth since its foundation in 1999

1. eno energy Wind Turbine Market Share in Germany in 2012 Page 6 " In Germany in 2012 the newly installed capacity of onshore wind turbines totaled 2.3 GW. " eno energy installed 16 eno wind turbines with a total capacity of 34 MW in Germany in 2012. Market share of new installed capacity in % 2 4 1 1 11 " The market share of eno energy of new installed capacity in Germany is about 2%. 24 57 Enercon Vestas REpower Nordex eno energy Vensys Other Basis: Deutsche Windguard, 31.12.2012, values rounded by eno energy eno energy amongst the top 5 manufacturers in Germany in 2012

1. eno energy Company Structure Page 7 eno energy GmbH Main Business: Developing and planning of wind projects, building project organizer of turn key wind farms, techn. and comm. management of wind farms Capital stock: 3,000,000 Euro 100% eno energy GmbH eno energy Sweden AB Main Business: Sales, installation of wind turbines Developing and planning of wind projects, building project organizer of turn key wind farms, techn. and comm. management of wind farms Capital stock: ca 2,000, 000 SEK Owner-managed company - no conglomerate, no stock market dependency -

1. eno energy Company Structure Page 8

2. Erfarenheter och lärdomar från drift och underhållsarbete Teknisk och kommersiell management Page 9 " Ställ er frågan: Vilken typ av anläggningsägare är jag? " Utifrån detta strukturera ert tekniska och kommersiella management " Kan också läggas ut till annan aktör " Kräv transparens från utförare av service och underhållsarbete " Management är viktigt för att kunna optimera och bugetera driftkostnader " Management viktigt för att kunna förhandla med leverantörer " Management viktigt för att kunna påtala brister i utförda arbeten Genom strukturerat arbete erhåller man lägre underhållskostnader

2. Erfarenheter och lärdomar från drift och underhållsarbete Anläggningsägare Tillverkare Page 10 Teknik val = lägre underhållskostnader? " Robust teknik " Reducering av laster " Komponenter med lågt underhållsbehov " Komponenternas exklusivitet och komplexitet " Övervakning av och kontroll av drivlinan och dess komponenter (CMS) " Övervakning av och kontroll av övriga komponenter (transformator, ställverk) " Redundans " Möjligheter att genomföra reperationer, felsökning, omkoppling mm över SCADA " Exklusiva jordarts metaller (tex Neodymium) kan öka underhållskostnader på sikt " Påverkan på försäkringspremier Tillverkarens teknik kan bidra till sänkta underhållskostnader

2. Erfarenheter och lärdomar från drift och underhållsarbete Anläggningsägare Tillverkare Page 11 Tillverkarens servicearbete " Service, drift och underhålls dokumentation. Hantering av all dokumentation omkring service, underhåll och komponenter. Är all dokumentation tillgänglig vid leverantörens konkurs eller nedläggning av verksamhet " Serviceverksamheten separerad från produktion av vindkraftverk " Tillverkarens egen service organisation? Används fristående serviceorganisation? Kombinationer? " Kompetens i serviceorganisationen " Tillverkarens generella syn på service och underhållsarbete " Förbyggande arbete " Arbetsmiljö ansvar Kontrollera hur leverantören arbetar med service långsiktigt

2. Erfarenheter och lärdomar från drift och underhållsarbete Page 12 Anläggningsägare Utförare av service och underhållsarbete Utförare av service och underhållsarbete " Kompetens " Referenser " Säkerhet " Tillgänglighet " Dokumentation (före, under, efter) " Driftövervakning (möjlighet till åtgärder över SCADA) " Tillgång till reservdelar " Försäkringar " Tillgänglighets garantier " Arbetsmiljöansvar Jämför aktörer. Både fristående och tillverkarens organisation

2. Erfarenheter och lärdomar från drift och underhållsarbete Från Fel Rapport till Analys och Dokumentation Page 13 Inkommande felrapport Start planlagd service ProdukJonsorder Material och resursplanering Serviceorder Genomförande av feleliminering eller servicearbete Aktuellt material och manskapsbehov Analys och dokumentajon Serviceprotokoll och rapport DokumentaJon Jll anläggningsägaren/ kund Dokumentationen viktig för kontroll och uppföljning eno;s anläggningsägare /kunder har all dokumentationen tillgänglig på vårt SCADA system Rotorsoft

2. Erfarenheter och lärdomar från drift och underhållsarbete Availabilities of eno Wind Turbines Page 14 No. WT Comm. 2008 2009 2010 2011 2012 * Fienstorf 1 Jun 08 97.00 94.00 97.48 95.28 98.18 98.46 Customer wind parks Prototypes Kirch Mulsow I Kirch Mulsow II Average availability Domnitz Domnitz II Plauerhagen Groß Trebbow Kauxdorf II Rüting Neutz Schönerlinde 1 1 No. WT 3 3 8 3 3 3 10 3 eno 92 WT Type eno 92 eno 92 Jul 10 Dec 10 Comm. Apr 09 Oct 09 May 10 Jan 12 Mar 12 Jul 12 Aug 12 Nov 12 97.00 94.00 2008 2009 96.33 96.25 98.00 97.74 2010 96.25 97.90 96.36 95.55 96.76 95.87 2011 98.15 98.20 98.44 95.66 97.53 97.12 2012 97.75 99.22 98.62 97.73 97.30 98.27 98.17 98.26 98.33 98.35 * 98.76 99.65 99.56 99.07 99.12 98.10 98.72 98.52 Floby, Sweden 1 eno 92 Jun 13 98.21 Average wind park availability 96.29 96.84 98.23 98.15 98.90 * Data basis January September

Tack så mycket Page 15 Gert-Olof (Måns) Holst eno energy Sweden AB Sjönevadsvägen 26 311 64 Vessigebro Telefon: 070 295 36 60 Email: mans.holst@eno-energy.com