1 On some aspects of power system stability and grid code requirements relevant for large scale wind power integration (Summary Report of Vindforsk project V-369) Elforsk rapport 13:04 Seon Gu Kim, Math Bollen, STRI January 2013
2 On some aspects of power system stability and grid code requirements relevant for large scale wind power integration (Summary Report of Vindforsk project V-369) Elforsk rapport 13:04 Seon Gu Kim, Math Bollen, STRI January 2013
3 Preface Sweden and other Nordic countries have ambitious renewable energy source (RES) integration target. This will represent a significant share of wind power in the future generation mix of Nordic countries. From a power system point of view, total understanding of technical impacts of this new generation source on the existing power system is vital to ensure a secure and reliable operation of the power system. In a higher wind power penetration scenario, wind power plants will need to contribute to system voltage and frequency control support, which is quite obvious and logical. In order to identify the possible impact of large scale wind power integration and to recommend on possible approaches to manage the impact the project described in this report was carried out with the research program Vindforsk III as project V-369 PosStaWind. The project consists of three parts focusing on different aspects of impact of wind power on the angular, frequency and voltage stability of a power system. This report consist the summary report of the whole project. The whole project is reported also in Elforsk reports 13:01, 13:02 and 13:03. The project is financed by Vindforsk III with substantial initial funding from the power system operators in Finland, Norway and Sweden, Fingrid, Statnett and Swedish National Grid. Vindforsk-III is funded by ABB, Arise windpower, AQ System, E.ON Elnät, E.ON Vind Sverige, Energi Norge, Falkenberg Energi, Fortum, Fred. Olsen Renewables, Gothia Vind, Göteborg Energi, HS Kraft, Jämtkraft, Karlstads Energi, Luleå Energi, Mälarenergi, o2 Vindkompaniet, Rabbalshede Kraft, Skellefteå Kraft, Statkraft, Sena Renewable, Svenska kraftnät, Tekniska Verken i Linköping, Triventus, Wallenstam, Varberg Energi, Vattenfall Vindkraft, Vestas Northern Europe, Öresundskraft and the Swedish Energy Agency. The work has been carried out by STRI with Nayeem Ullah and later with Seon Gu Kim as a project leader. Several people at STRI have contributed to the work.
4 Comments on the work and the final report have been given by a reference group with the following members: Tuomas Rauhala, Nikkilä Antti-Juhani Terje Gjengedal, Katherine Elkington, Johan G. Persson, Staffan Mared, Kjell Gustafsson, Fingrid Fingrid Statnett Svenska Kraftnät (National Swedish Grid) E.on Vattenfall Statkraft Stockholm January 2013 Anders Björck Programme manager Vindforsk-III Electricity and heat production, Elforsk AB
5 Sammanfattning Denna rapport sammanfattar de metoder och studieresultat från tre olika aspekter av integrering av vindkraft i ett transmissionsnät: effektpendlingar i kraftnätet, syntetisk tröghet och transient reaktiv effekt. Studien utfördes i ett projektpaket innehållande tre olika delprojekt som var och en avhandlar en av dessa tre aspekter. Del 1: Effektpendlingar i kraftnätet Detta delprojekt analyserar vilken påverkan en vindkraftsparks spänningsreglering har på effektpendlingar i kraftnätet. I grundstudien har man använt IEEE:s Two-Area System, tillsammans med en utökad version av Nordic-32 modellen för att representera det sammanlänkade nordiska kraftsystemet. Studien baseras på 0,35 Hz moden på grund av att det faktum att generatorerna i Finland svänger mot generatorerna i södra Sverige och Norge med denna frekvens. En grundläggande slutsats av studien är att påverkan från en vindkraftpark på effektpendlingen mellan olika områden i nätet är starkt beroende av anslutningspunkten. En viss vindkraftspark med en viss regulator ger en liten förbättring i en anslutningspunkt, men en kraftig försämring i annan. Studiefallet med vindkraftsparker lokaliserade i Finland visar att 0,35 Hz moden påverkas positivt. Men vid hög effektproduktion (och med ökad export till Sverige), blir svängningsmoden negativt dämpad. Detta beror troligen på det ökade effektflödet i förbindelsen och inte på vindkraftsparkens spänningsregulator. Studiefallet med vindkraftsparker i tre länder (Sverige, Norge och Finland), visar att dämpningen förbättras i jämförelse med fallet utan vindkraft ansluten. Denna förbättring kan dock bero på det förändrade lastflödet och produktionssituationen. Sammanfattningsvis kan det sägas att vindkraftsparker i Finland bidrar till ökad dämpning i fallet med lokal kraftkonsumtion, och kraftexport till Sverige via de norra delarna av nätet. Men fallen med vindkraftsproduktion fördelat i Sverige, Norge och Finland har bara en mindre påverkan på effektpendlingen mellan olika områden i nätet. Del 2: Syntetisk tröghet från vindkraftsparker Målet med denna del är att studera frekvensstabiliteten i elkraftsystemet när vindkraftsparker deltar i frekvensregleringen via den s.k. syntetisk tröghet (eng. synthetic inertia). Vindkraftsparker med generatorer av typen DFIG eller FPWTC, bidrar inte till den totala trögheten i kraftsystemet. I enlighet med detta innebär en ersättning av konventionell produktion med vindkraftproduktion en minskning av den totala trögheten i kraftsystemet, med följd att kvaliteten på frekvensen försämras. Ett sätt att förhindra denna försämring är att installera vindkraftsturbiner med syntetisk tröghet. Ett antal studier har utförts i en utökad Nordic-32 modell, med syfte att studera inverkan av syntetisk tröghet på frekvensstabiliteten efter bortkoppling av en stor produktionsenhet. En bortkoppling av 4,3% av
6 produktionen, ger en lägsta frekvens på 49,45 Hz med syntetisk tröghet, i jämförelse med en 49,30 Hz utan. Vindkraftsparker med syntetisk tröghet ger således upphov till en förhöjd lägstafrekvens och motverkar lastbortkoppling till följd av låg frekvens. Oavsett detta bidrag, kan dock den syntetiska trögheten fördröja återhämtningen och ställa högre krav de primära reserverna. De studier som utförts för att hitta optimal inställning för regulatorn visar att de standardvärden som tillhandahålls av tillverkaren anses som de mest optimala. Att försöka hitta den mest optimala regulatorinställningen innebär att man får kompromissa mellan att kunna få ett maximalt bidrag under de första sekunderna efter en förlust av en produktionsenhet och behovet av ytterligare kraft som då resulterar i en fördröjd återhämtning av nätfrekvensen. Del 3: Transient reaktiv effekt Målet med denna del är att studera spänningsåterhämtningen under de första hundratals millisekunderna efter bortkoppling av ett fel (eng. transient voltage recovery). Den reaktiva effekten som krävs vid en transient spänningsåterhämtning (vid bortkoppling av ett fel), säkras i de flesta länder via en vindkraftsparks förmåga att inte kopplas bort från nätet vid låg spänning (eng. LVRT=Low Voltage Ride Through). I takt med att andelen vindkraft i nätet ökar, har många länder börjat införa omfattande krav på kontroll av reaktiv ströminjektion för vindkraftsparker i syfte att kontrollera den reaktiva effekten under en nätstörning. Simuleringar av spännings återhämtning efter 130-kV och 400-kV fel nära stora vindkraftverk i Nordic-32 modellen visar att den använda spännings regulatorn möjliggör en stabil återhämtning även för ett svagt system. Simuleringar har utförts för vindkraft produktion av 10 %, 15 % och 20 % av den totala produktionen. Systemet visade sig vara stabil för kortslutningsförhållande (short-circuit ratio) ner till 2,06. Spänning visade en överspänning upp till ca 120 % av den nominella spänningen omedelbart efter bortkoppling av ett fel. Dock inga negativa effekter från denna överspänning är att vänta. Ett effektivt sätt att minska överspänningen är genom att minska den övre gränsen av styrkommandot som kommer från spänningsregulator. Detta kan dock också begränsa möjligheten för vindkraftsparken att reglera spänningen under normal drift. Simuleringarna visar också svängningar i spänningens amplitud ca 400 ms efter bortkoppling av ett fel. Dessa svängningar är inte ett bekymmer i sig, men de kunde peka på potentiell instabilitet från växelverkningen mellan spänningsregleringen av vindkraftparken och de konventionella produktionsenheterna. Det visas att dessa svängningar kan dämpas genom att ändra värdena hos vissa reglerparametrar eller genom att sänka den tröskel vid vilken överspänningsstyrning av omvandlaren aktiveras.
7 Summary This report summarizes the methods and results of a study after three specific aspects of wind-power integration in the transmission system: inter-area power oscillation; synthetic inertia; and transient reactive power. This study was conducted in a project package consisting of three sub-projects each covering one of these aspects. Part 1: Inter-area power oscillation This part deals with the effect of wind farm voltage controllers on inter-area power oscillations. The IEEE two-area test system is used for a fundamental investigation, whereas a modified Nordic-32 test system is used to represent the Nordic interconnected system. Particularly, taking into account that the generators in Finland oscillate against generators in south of Sweden and Norway at around 0.35 Hz in the interconnected Nordic system, the studies are based on the 0.35 Hz mode. The fundamental investigation shows that the impact of a wind farm on the inter-area oscillation is strongly location dependent. The same wind farm with the same controller shows a slight improvement at one location, but a huge deterioration at another location. The study with wind farms only located in Finland shows that the impact on the 0.35 Hz mode is in general positive. However, when the production from wind farm is high, increasing the export into Sweden, the mode becomes negatively damped. This is most likely a ramification of the increased tie line flow and not due to the voltage controller of the wind farm. The study with wind farms located in three countries (Sweden, Norway, and Finland) shows that the damping of the inter-area mode is improved compared to the case without wind power. However, this improvement could be due to the changed load flow and generation dispatch conditions considered. In conclusion, the presence of wind farms i Finland could contribute to increase the damping for local consumption as well as exporting the produced power to Sweden through the north. Whereas, the consideration of wind power throughout Sweden, Norway and Finland has only minor impact on the inter-area oscillations for the cases studied. Part 2: Synthetic inertia from wind farms The goal of this part is to study power system frequency stability when wind farms contribute to system frequency control through the so called synthetic inertia. Wind farms with DFIG (double fed induction generator) machines and those using a full-power converter, do not contribute to the total moment of inertia in the system. Accordingly, replacing conventional production units with wind farms results in a reduction of the total moment of inertia, eventually deteriorating the frequency quality. Installing wind turbines with synthetic inertia is a way of preventing this deterioration. A number of studies have been performed to study the impact
8 of synthetic inertia on frequency excursion in a few seconds after the loss of a large production unit by means of augmented Nordic-32 model. For a 4.3% loss of production, the synthetic inertia results in a minimum frequency of Hz, versus Hz without synthetic inertia. Accordingly, wind farms with synthetic inertia have the ability to increase the minimum frequency and prevent under-frequency load shedding. Regardless of this contribution, synthetic inertia may delay the frequency recovery and put higher demand on the primary reserves. The default parameter values provided by the manufacturer are deemed as optimal parameters. However the selection of optimal parameter might be a trade-off between the contribution during the initial seconds after the production loss and the need for additional power resulting in a delayed frequency recovery. Part 3: Transient reactive power The goal of this part is to study the voltage recovery during the first few hundred milliseconds after clearing a fault (the transient voltage recovery ). Reactive power requirement for transient voltage recovery after clearing a fault is secured via low voltage ride through capability with wind power integration in most countries. As the scale of grid connected wind power is increased, many countries have started to impose advanced requirements of reactive current injection control on wind farms so as to control reactive power during network disturbances. Simulations of transient voltage recovery after 130-kV and 400-kV faults close to large wind-power installations in the Nordic-32 model show that the used voltage controller enables a stable recovery even for a weak system. Simulations have been performed for wind power production of 10%, 15% and 20% of the total production. The system was shown to remain stable for short-circuit ratios down to The rms (root mean square) voltage showed an overvoltage up to about 120% of the nominal voltage immediately after fault clearing. However, no adverse impacts from this overvoltage are to be expected. An effective way of reducing the overvoltage is by reducing the upper limit of the excitation command from the voltage controller. This might however also limit the ability of the wind farm to control the voltage during normal operation. The simulations also show oscillations in rms voltage about 400 ms after fault clearing. These oscillations are not a concern by themselves, but they could point to potential instabilities from the interaction between the voltage controllers of the wind farm and those of the conventional units. It is shown that these oscillations can be damped by changing the values of certain controller parameters or by lowering the threshold at which the overvoltage management of the converter is activated.
9 Contents 1 Motivation and Objectives Background Motivations and Objectives Modelling and Study Approaches Main Models Study Approaches Software Achievements Part 1: Inter-area power oscillations Part 2: Synthetic inertia from wind farms Part 3: Transient reactive power Conclusions and Future Works Conclusions Future Works References 10
10 1 Motivation and Objectives 1.1 Background The Nordic countries have ambitious renewable energy source integration targets. This will result in a significant share of wind power in the future generation mix of Nordic countries. In a higher wind power penetration scenario, wind farms will need to contribute to system voltage and frequency control support. However, this needs to be done in a systematic way through detailed system level studies. There is limited published system level operational and control related experience with large amount of wind power contributing to the voltage and frequency stability of large transmission networks. 1.2 Motivations and Objectives The purpose of this project package is to carry out system stability studies to be able to identify the impact of large scale wind power integration on interarea oscillation, frequency stability and transient voltage recovery of a power system. This project package consists of three sub-projects, covering these three aspects of system stability. Part 1: Inter-area power oscillation Among the power system stability phenomena, poorly damped inter-area oscillations in the range of 0.1 Hz to 0.8 Hz are a concern for a reliable operation of modern large interconnected power systems. The poorly damped oscillations might be sensed by the voltage/reactive power controllers within wind farm and could be reflected on the output of the wind farm in the form of varying reactive power. In a certain worst case, the wind farm controller output may exhibit oscillatory behaviour at a certain frequency and the resulting oscillatory reactive power injection from wind farms might degrade the damping of the existing inter-area electromechanical oscillations depending on the wind power penetration level. The main goal of the Part 1 is the investigation of the effect of wind farm voltage controller on inter-area power oscillations in the Nordic interconnected power system. Part 2: Synthetic inertia from wind farms The incoming wind power integration scenario into the existing power system may vary considerably. The impact of wind power integration on the system frequency control function will also depend on the integration scenario. In this regard, one of the concerns is reduced system inertia in the presence of large amount of wind power which will result in higher rate of change of frequency and higher frequency drops after a generation disconnection scenario, which may lead to frequency instability. The background for this concern is the fact that power electronic interfaces in variable speed wind turbines will normally hide generator inertia from contribution to the system. Thus the goal of this 1
11 Part 2 is to study power system frequency stability when large amount of wind power plants contribute to system frequency through synthetic inertia. Part 3: Transient reactive power Connecting large wind farms to the transmission system makes that transmission system operators (TSOs) have to consider the impact of these wind farms on the transmission grid. The main impacts are related to the replacement of conventional power stations by wind farms during periods with high levels of production from wind power. The impact is complex and covers a range of transient stability phenomena, steady-state phenomena as well as phenomena related to faults in the grid. Thus the goal of this Part 3 is to study one of impacts from the high level production of wind farm. The studied impact is transient voltage recovery, which is related to the voltage recovery during the first few hundred milliseconds after clearing a fault. 2
12 2 Modelling and Study Approaches 2.1 Main Models Wind farm model A manufacturer released model of a multi-mw commercial variable speed wind turbine (GE 3.6 MW) is used in this work which is adopted from [4]. This model is also included in the model library of PSS/E as user written models, the description of which can be found in [5]. Network models The original CIGRE Nordic-32 system, which is intended to represent the Nordic interconnected power system for studying voltage instability phenomena [6], is modified in order to study the different phenomena within Part 1, Part 2 and Part Study Approaches Part 1: Inter-area power oscillation Firstly the selected General Electric (GE) wind turbine voltage controller is used to investigate the wind farm s voltage controller performance under various grid conditions. Secondly the fundamental study of inter-area power oscillation is performed by connecting a single wind farm at different buses (sending end, receiving end, on tie-line) in the IEEE two-area system. Finally, the planned wind farm within Nordic region is considered for inter-area power oscillation. Planned wind farms only located in Finland is firstly considered, and then wind farms located in three countries (Sweden, Norway and Finland); in both cases the wind-farm models are included in the Nordic-32 system simulations. Part 2: Synthetic inertia from wind farms Basic approach in this part of the project is to compare frequency change caused by the loss of production units between with and without wind farm in the modified Nordic-32 network model. Two operational scenarios are used in the studies. Firstly Nordic-32 system is assumed to operate condition with high nuclear/low hydro production and the power production of wind farm is 22% of total active power production. Secondly Nordic-32 system is assumed to operate with moderate nuclear/high hydro production and the power production of wind farm is 23% of total active power production. Finally parameter tuning studies of wind inertial controller model is performed to propose the optimal control parameters by alternating control parameter values. 3
13 Part 3: Transient reactive power Firstly three capacity scenarios (10%, 15% and 20%) are used to consider the impact of power production level from wind farm. Secondly the locational impact of wind power integration is included in wind power capacity scenario so that two areas (Northern and Central area) are equally taken into account as wind power integration region. 2.3 Software PSS/E function modules (Load Flow and LSYSAN) have been used in simulation studies. In addition, Matlab is used for some scientific calculations. 4
14 3 Achievements 3.1 Part 1: Inter-area power oscillations Disturbance rejection capability of voltage controller The purpose of disturbance rejection capability is to investigate the mechanism by which control parameter will influence the existing inter-area oscillation at the grid. Particularly, taking into account that the generators in Finland oscillate against generators in south of Sweden and Norway at around 0.35 Hz, disturbance rejection capability is reviewed around this frequency. The simulations in his project have shown that slowly varying disturbance is effectively rejected by the voltage controller up to 0.1 Hz. The lead angle becomes around 160 degrees and voltage controller exhibits a high gain at 0.35 Hz, showing that disturbance rejection capability could be impacted. Fundamental study on inter-area oscillation by wind farm voltage controller The IEEE two-area system is studied to verify the impact of wind turbine voltage controller on power system oscillation. The fundamental studies show that the impact is strongly location dependent. The same wind farm with the same controller shows a slight improvement at one location but a huge deterioration at another location. Nordic-32 system study on inter-area oscillation by wind farm voltage controller The study of wind farms from only Finland shows that the sole impact of the planned wind farm s voltage controllers is in general positive on the 0.35 Hz mode. However, when the production from wind farm is high, increasing the tie line flow to Sweden, the mode becomes negatively damped. The negative damping of the 0.35 Hz mode due to the planned wind farms cannot be directly attributed to the wind farm voltage controllers, instead it could be a ramification of the changed system power flow (increased tie line flow) caused by the introduction of new production in Finland. The study of wind farms from three countries (Sweden, Norway, and Finland) shows that the damping of the inter-area mode is improved compared to the case without wind power. However, as mentioned above, the improvement of the damping could be due to the changed system load flow and generation dispatch conditions considered. Thus if power system operational condition is changed, that might result in a different damping mode. Accordingly, it might be inferred that the presence of wind farms within Finland could contribute to increase the damping for local consumption as well as exporting the produced power to Sweden through the north. Considering wind power throughout 5
15 Sweden, Norway and Finland has only minor impact on the inter-area oscillations for the cases studied. 3.2 Part 2: Synthetic inertia from wind farms Impact of wind turbines on Nordic system inertia Wind farms based on double fed induction generator do not contribute to the moment of inertia of the system. The same holds for wind turbines connected to the grid by a full-power converter. When conventional synchronous generators are replaced by wind power without synthetic inertia, the total moment of inertia of the system will become less and the frequency stability will deteriorate. Thus it might be inferred that as the scale of wind is increased, the frequency stability might be more deteriorated without any prevention measures. Effects of Synthetic Inertia for improving Nordic system inertia Given that the power production of wind farm is assumed to have 22% of total active power production in the operation condition with high nuclear/low hydro production as well as the amount of power production loss of synchronous generators is assumed by 4.3% of total consumption, the minimum primary frequency is investigated by means of two options (without and with synthetic inertia), showing the minimum frequency as below. Loss of production Without synthetic inertia With synthetic inertia 4.3% Hz Hz It is shown that wind farms are able to contribute to the frequency stability during the first few seconds after a loss of production by extracting the stored kinetic energy through the synthetic inertia of the wind turbine. As a result, it is possible to increase the minimum frequency and to prevent underfrequency load shedding. However the contribution from the synthetic inertia might not be sufficient to prevent a large frequency drop with a severe loss of production. Optimal tuning of synthetic inertia for Nordic system inertia Optimal tuning is performed to find the best control parameter within synthetic inertia for improving frequency stability support by the wind turbine. Two control parameters, i.e. wind inertia gain and wash-out time constant are investigated to find the optimal values. The criterion for selecting the most optimized value for a parameter is to obtain best frequency support considering both rate of change and minimum value. The default parameter values provided by manufacturer are deemed as optimal parameters. However the selection of optimal parameter needs a trade-off between the contribution during the initial seconds after the production loss and the need for additional power resulting in a delayed frequency recovery. 6
16 3.3 Part 3: Transient reactive power Literature review on transient reactive power Reactive power requirement for transient voltage recovery after clearing a fault is secured via LVRT (low voltage ride through) capability with wind power integration in the most countries. As the scale of grid connected wind power is increased, many countries have started to impose advanced requirements of reactive current injection control on wind farms so as to control reactive power during network disturbance. Technical review shows that the grid strength could determine the voltage behaviour of wind power connection point in DFIG-connected power system. Also, voltage collapse point might be changed by replacing conventional synchronous machine with wind power, deteriorating voltage stability. Thus, the maximum amount of wind power integration should be carefully reviewed from the transient reactive power perspective. Impact of large scale wind farm on transient reactive power Reactive power requirements for transient voltage recovery after clearing a fault are secured via the low voltage ride through (LVRT) capability with wind power integration in the most countries. As the scale of grid-connected wind power is increased, many countries have started to impose advanced requirements of reactive current injection control on wind farms so as to control reactive power during a network disturbance. Simulations of transient voltage recovery after 130-kV and 400-kV faults close to large wind-power installations in the Nordic-32 model show that the used voltage controller enables a stable recovery even for a weak system. Simulations have been performed for wind power production of 10%, 15% and 20% of the total production. The system was shown to remain stable for short-circuit ratios down to The rms (root mean square) voltage showed an overvoltage up to about 120% of the nominal voltage immediately after fault clearing. However, no adverse impacts from this overvoltage are to be expected. An effective way of reducing the overvoltage is by reducing the upper limit of the excitation command from the voltage controller. This might however also limit the ability of the wind farm to control the voltage during normal operation. The simulations also show oscillations in rms voltage about 400 ms after fault clearing. These oscillations are not a concern by themselves, but they could point to potential instabilities from the interaction between the voltage controllers of the wind farm and those of the conventional units. It is shown that these oscillations can be damped by changing the values of certain controller parameters or by lowering the threshold at which the overvoltage management of the converter is activated. 7
17 4 Conclusions and Future Works 4.1 Conclusions Part 1: Inter-area power oscillation The case study with wind farms from only Finland shows that the impact of wind farm s voltage controllers is in general positive on the 0.35 Hz mode. However, when the production from wind farm is highest and the surplus production is exported into Sweden, increasing the tie line flow, the mode becomes negatively damped. The case study with wind farms from three countries (Sweden, Norway, and Finland) shows that the damping of the inter-area mode is improved compared to the case without wind power. The improvement of the damping could be due to the changed system load flow and generation dispatch conditions considered. However, taking into account that the impact of wind farm voltage controller characteristics depended on operational conditions or wind integration scenarios of Nordic power system, the extent of the case studies may not allow us to draw general conclusions. From the perspective of Nordic transmission network, those issues need to be further analysed in a more comprehensive and systematic manner. Part 2: Synthetic inertia from wind farms Wind farms based on double fed induction generator do not contribute to the moment of inertia of the system. However, the synthetic inertia within wind turbines can support the frequency in the first few seconds after a loss of production by extracting the stored kinetic energy through the synthetic inertia within wind turbine. As a result, it is possible to increase the minimum frequency and to prevent under-frequency load shedding. Part 3: Transient reactive power As the scale of grid-connected wind power is increased, many countries have started to impose advanced requirements of reactive current injection control on wind farms so as to control reactive power during a network disturbance. Simulations of transient voltage recovery after 130-kV and 400-kV faults close to large wind-power installations in the Nordic-32 model show that the used voltage controller enables a stable recovery even for a weak system. The system was shown to remain stable for short-circuit ratios down to The rms voltage showed an overvoltage up to about 120% of the nominal voltage immediately after fault clearing. An effective way of reducing the overvoltage is by reducing the upper limit of the excitation command from the 8
18 voltage controller. This might however also limit the ability of the wind farm to control the voltage during normal operation. 4.2 Future Works Based on observed conclusions of the respective reports, some recommendations are given to operate power systems with large scale wind power integration. Firstly, the results from the IEEE model should be analysed in more depth to find out if there are locational advantage for reducing damping in Nordic grid. In addition, further study is needed to quantify the relation between the disturbance-rejection capability of the controller and the reduction or increase of the damping of the inter-area oscillations. Secondly, further work is needed in the development of control algorithms for synthetic inertia, where the main challenge is to be able to contribute to the inertia during the first few seconds without delaying the frequency recovery unnecessary and without putting extra requirements on the primary reserve. A fundamental study is needed to find out under which circumstances (e.g. low consumption in combination with high amounts of wind power) the activation of synthetic inertia or a similar measure is needed and how often such circumstances occur. A related study is to do find out when and how often synthetic inertia in all or a selected number of wind turbines is insufficient. Finally, a potential oscillation is observed and damped by changing certain control value of voltage controller with large scale wind power integration. Thus, further work is needed in deciding the hosting-capacity, which is not included in this project, with large scale wind farm connection from a transient stability perspective, and analysing the interaction between the voltage controllers from wind farms and those from conventional production units. 9
19 5 References [1] Nayeem R. Ullah, The effect of voltage control response characteristics of wind plants on damping of inter-area power oscillations, Vindfork V-369 Report (Part 1), September, [2] Mohammad Seyedi, The utilization of synthetic inertia from large number of wind farms and its impact on existing speed governors and system performance, Vindfork V-369 Report (part 2), September, [3] Seon Gu Kim, Towards the development of a set of grid code requirements for wind farms: Transient reactive power requirements, Vindfork V-369 Report (Part 3), September, [4] K. Clark, N. W. Miller, J. J. Sanchez-Gasca, Modeling of GE wind turbine generators for grid studies, GE power system energy consulting, U.S.A., technical report version 4.3, April [5] Y. Kazachkov, PSSE wind modelling package for GE 1.5/3.6/2.5MW wind turbines user guide, Siemens energy, Inc., issue 5.1.0, June [6] K. Walve, Nordic32-A Cigre test system for simulation of transient stability and long term dynamics, Svenska Kraftnät, Sweden, technical report, [7] J. Ekanayake and N. Jenkins, Comparison of the response of doubly fed and fixed speed induction generator wind turbines to changes in network frequency, IEEE Trans. Energy Conv., vol. 19, no. 4, pp , Dec [8] A. Mullane and M. O Malley, The inertial response of induction machine based wind turbines, IEEE Trans. Power Syst., vol. 20, no. 3, pp , Aug [9] K. Clark et el., Modeling of GE wind turbine-generators for grid studies, GE International, Inc., USA, Tech. Rep., v 4.3, April [10] M. Bollen and F. Hassan, Integration of distributed generation in the power system, Wiley,
20 11
Viktig information för transmittrar med option /A1 Gold-Plated Diaphragm
Viktig information för transmittrar med option /A1 Gold-Plated Diaphragm Guldplätering kan aldrig helt stoppa genomträngningen av vätgas, men den får processen att gå långsammare. En tjock guldplätering
Vindforsk IV update of ongoing projects
Vindforsk IV update of ongoing projects A collaborative program between the Swedish Energy Agency and Energiforsk , Vindforsk IV shall strengthen the knowledge and competence needed to build, integrate
NORDIC GRID DISTURBANCE STATISTICS 2012
NORDIC GRID DISTURBANCE STATISTICS 2012 Utdrag ur rapport utarbetad av DISTAC-gruppen under RGN inom ENTSO-E Sture Holmström 2 Korta bakgrundsfakta > 1999-2000 utarbetades Riktlinjer för klassificering
Nya driftförutsättningar för Svensk kärnkraft. Kjell Ringdahl EON Kärnkraft Sverige AB
Nya driftförutsättningar för Svensk kärnkraft Kjell Ringdahl EON Kärnkraft Sverige AB Innehåll 1.Förändringar i det Svenska energisystemet 2.Nuvarande förutsättningar 3.Internationella studier/erfarenheter
Vattenkraften har en centrala roll i kraftsystemet
Elforsk 14 juni 2013 Vattenkraften har en centrala roll i kraftsystemet Vattenkraft används för att reglera ut förbrukningsvariationer. 1-7 januari 2011. Reglering med vattenkraft är billig vilket ger
A study of the performance
A study of the performance and utilization of the Swedish railway network Anders Lindfeldt Royal Institute of Technology 2011-02-03 Introduction The load on the railway network increases steadily, and
Beijer Electronics AB 2000, MA00336A, 2000-12
Demonstration driver English Svenska Beijer Electronics AB 2000, MA00336A, 2000-12 Beijer Electronics AB reserves the right to change information in this manual without prior notice. All examples in this
Stiftelsen Allmänna Barnhuset KARLSTADS UNIVERSITET
Stiftelsen Allmänna Barnhuset KARLSTADS UNIVERSITET National Swedish parental studies using the same methodology have been performed in 1980, 2000, 2006 and 2011 (current study). In 1980 and 2000 the studies
Spänningsdippar - spänningsdippskaraktäristik i en knutpunkt till följd av fel i omgivande nät
Spänningsdippar - spänningsdippskaraktäristik i en knutpunkt till följd av fel i omgivande nät Ilijaz Kenjar & Maria Olsson ISSN 1401-6184 INSTITUTIONEN FÖR ELTEKNIK Examensarbete 77E 2003 Titel Spänningsdippar:
Solar eclipse (Friday)
Solar eclipse 215-3-2 (Friday) Ett aktuellt exempel Installed PV capacity in central Europé is aproxemately 87 MW. 2 mars 215, 8:4-12:5 CET a solar eclipse occur. With a clear blue sky around 3 MW of PV
Styrteknik: Binära tal, talsystem och koder D3:1
Styrteknik: Binära tal, talsystem och koder D3:1 Digitala kursmoment D1 Boolesk algebra D2 Grundläggande logiska funktioner D3 Binära tal, talsystem och koder Styrteknik :Binära tal, talsystem och koder
Resultat av den utökade första planeringsövningen inför RRC september 2005
Resultat av den utökade första planeringsövningen inför RRC-06 23 september 2005 Resultat av utökad första planeringsövning - Tillägg av ytterligare administrativa deklarationer - Variant (av case 4) med
Signatursida följer/signature page follows
Styrelsens i Flexenclosure AB (publ) redogörelse enligt 13 kap. 6 och 14 kap. 8 aktiebolagslagen över förslaget till beslut om ökning av aktiekapitalet genom emission av aktier och emission av teckningsoptioner
Examensarbete Introduk)on - Slutsatser Anne Håkansson annehak@kth.se Studierektor Examensarbeten ICT-skolan, KTH
Examensarbete Introduk)on - Slutsatser Anne Håkansson annehak@kth.se Studierektor Examensarbeten ICT-skolan, KTH 2016 Anne Håkansson All rights reserved. Svårt Harmonisera -> Introduktion, delar: Fråga/
Custom-made software solutions for increased transport quality and creation of cargo specific lashing protocols.
Custom-made software solutions for increased transport quality and creation of cargo specific lashing protocols. ExcelLoad simulates the maximum forces that may appear during a transport no matter if the
Goals for third cycle studies according to the Higher Education Ordinance of Sweden (Sw. "Högskoleförordningen")
Goals for third cycle studies according to the Higher Education Ordinance of Sweden (Sw. "Högskoleförordningen") 1 1. Mål för doktorsexamen 1. Goals for doctoral exam Kunskap och förståelse visa brett
Utmaningar och möjligheter vid 100% förnybar elproduktion
Utmaningar och möjligheter vid 100% förnybar elproduktion Uppsala StandUp for Wind 6 oktober 2015 Lennart Söder Professor Elektriska Energisystem, KTH Projektering & Etablering Konstruktion & Produktion
Alias 1.0 Rollbaserad inloggning
Alias 1.0 Rollbaserad inloggning Alias 1.0 Rollbaserad inloggning Magnus Bergqvist Tekniskt Säljstöd Magnus.Bergqvist@msb.se 072-502 09 56 Alias 1.0 Rollbaserad inloggning Funktionen Förutsättningar Funktionen
2.1 Installation of driver using Internet Installation of driver from disk... 3
&RQWHQW,QQHKnOO 0DQXDOÃ(QJOLVKÃ'HPRGULYHU )RUHZRUG Ã,QWURGXFWLRQ Ã,QVWDOOÃDQGÃXSGDWHÃGULYHU 2.1 Installation of driver using Internet... 3 2.2 Installation of driver from disk... 3 Ã&RQQHFWLQJÃWKHÃWHUPLQDOÃWRÃWKHÃ3/&ÃV\VWHP
Support for Artist Residencies
1. Basic information 1.1. Name of the Artist-in-Residence centre 0/100 1.2. Name of the Residency Programme (if any) 0/100 1.3. Give a short description in English of the activities that the support is
Klimatpåverkan och de stora osäkerheterna - I Pathways bör CO2-reduktion/mål hanteras inom ett osäkerhetsintervall
Klimatpåverkan och de stora osäkerheterna - I Pathways bör CO2-reduktion/mål hanteras inom ett osäkerhetsintervall Vi måste förstå att: Vårt klimat är ett mycket komplext system Många (av människan påverkade)
STORSEMINARIET 3. Amplitud. frekvens. frekvens uppgift 9.4 (cylindriskt rör)
STORSEMINARIET 1 uppgift SS1.1 A 320 g block oscillates with an amplitude of 15 cm at the end of a spring, k =6Nm -1.Attimet = 0, the displacement x = 7.5 cm and the velocity is positive, v > 0. Write
Country report: Sweden
Country report: Sweden Anneli Petersson, PhD. Swedish Gas Centre Sweden Statistics for 2006 1.2 TWh produced per year 223 plants 138 municipal sewage treatment plants 60 landfills 3 Industrial wastewater
Semantic and Physical Modeling and Simulation of Multi-Domain Energy Systems: Gas Turbines and Electrical Power Networks
DEGREE PROJECT IN ELECTRICAL ENGINEERING, SECOND CYCLE, 30 CREDITS STOCKHOLM, SWEDEN 2017 Semantic and Physical Modeling and Simulation of Multi-Domain Energy Systems: Gas Turbines and Electrical Power
SWESIAQ Swedish Chapter of International Society of Indoor Air Quality and Climate
Swedish Chapter of International Society of Indoor Air Quality and Climate Aneta Wierzbicka Swedish Chapter of International Society of Indoor Air Quality and Climate Independent and non-profit Swedish
The Algerian Law of Association. Hotel Rivoli Casablanca October 22-23, 2009
The Algerian Law of Association Hotel Rivoli Casablanca October 22-23, 2009 Introduction WHY the Associations? NGO s are indispensable to the very survival of societal progress Local, National or International
Sara Skärhem Martin Jansson Dalarna Science Park
Sara Skärhem Martin Jansson Dalarna Science Park Sara Skärhem Martin Jansson Vad är innovation? På Wikipedia hittar man: En innovation är en ny idé, till exempel i form av en produkt, lösning, affärsidé,
EASA Standardiseringsrapport 2014
EASA Standardiseringsrapport 2014 Inför EASA Standardiseringsinspektion hösten 2016 Presentatör Johan Brunnberg, Flygteknisk Inspektör & Del-M Koordinator Sjö- och luftfartsavdelningen Enheten för operatörer,
PowerCell Sweden AB. Ren och effektiv energi överallt där den behövs
PowerCell Sweden AB Ren och effektiv energi överallt där den behövs Requirements of power electronics for fuel cells in electric vehicles Andreas Bodén (Rickard Nilsson) Förstudie: Kravställning på kraftelektronik
Health café. Self help groups. Learning café. Focus on support to people with chronic diseases and their families
Health café Resources Meeting places Live library Storytellers Self help groups Heart s house Volunteers Health coaches Learning café Recovery Health café project Focus on support to people with chronic
SOLAR LIGHT SOLUTION. Giving you the advantages of sunshine. Ningbo Green Light Energy Technology Co., Ltd.
2017 SOLAR LIGHT SOLUTION Address:No.5,XingYeMiddleRoad,NingboFreeTradeZone,China Tel:+86-574-86812925 Fax:+86-574-86812905 Giving you the advantages of sunshine SalesServiceE-mail:sales@glenergy.cn Tech.ServiceE-mail:service@glenergy.cn
Understanding Innovation as an Approach to Increasing Customer Value in the Context of the Public Sector
Thesis for the degree of Licentiate of Philosophy, Östersund 2014 Understanding Innovation as an Approach to Increasing Customer Value in the Context of the Public Sector Klas Palm Supervisors: Håkan Wiklund
Love og regler i Sverige Richard Harlid Narkos- och Intensivvårdsläkare Aleris FysiologLab Stockholm
Love og regler i Sverige Richard Harlid Narkos- och Intensivvårdsläkare Aleris FysiologLab Stockholm Driving in the USA Driving is the lifeblood of the United States. It fosters commerce, recreation and
SHP / SHP-T Standard and Basic PLUS
Range Features PRODUCT OVERVIEW Lampfinish Lampform coated elliptical Färgtemperatur (K) 2000 CRI (Ra) 20 Dimbart Yes EAN-kod 5410288208435 Energiklass A+ Sockel/Bas Modell E40 SHP Watt (nominell) (W)
Grafisk teknik IMCDP IMCDP IMCDP. IMCDP(filter) Sasan Gooran (HT 2006) Assumptions:
IMCDP Grafisk teknik The impact of the placed dot is fed back to the original image by a filter Original Image Binary Image Sasan Gooran (HT 2006) The next dot is placed where the modified image has its
Beslut om bolaget skall gå i likvidation eller driva verksamheten vidare.
ÅRSSTÄMMA REINHOLD POLSKA AB 7 MARS 2014 STYRELSENS FÖRSLAG TILL BESLUT I 17 Beslut om bolaget skall gå i likvidation eller driva verksamheten vidare. Styrelsen i bolaget har upprättat en kontrollbalansräkning
EBBA2 European Breeding Bird Atlas
Methodology Sergi Herrando, Verena Keller, Petr Voříšek et al. objectives 1. To document breeding evidence for all bird species at a resolution of 50x50 km 2. To estimate abundance for all bird species
Boiler with heatpump / Värmepumpsberedare
Boiler with heatpump / Värmepumpsberedare QUICK START GUIDE / SNABBSTART GUIDE More information and instruction videos on our homepage www.indol.se Mer information och instruktionsvideos på vår hemsida
Alla Tiders Kalmar län, Create the good society in Kalmar county Contributions from the Heritage Sector and the Time Travel method
Alla Tiders Kalmar län, Create the good society in Kalmar county Contributions from the Heritage Sector and the Time Travel method Goal Bring back the experiences from the international work of Kalmar
FORSKNINGSKOMMUNIKATION OCH PUBLICERINGS- MÖNSTER INOM UTBILDNINGSVETENSKAP
FORSKNINGSKOMMUNIKATION OCH PUBLICERINGS- MÖNSTER INOM UTBILDNINGSVETENSKAP En studie av svensk utbildningsvetenskaplig forskning vid tre lärosäten VETENSKAPSRÅDETS RAPPORTSERIE 10:2010 Forskningskommunikation
Information technology Open Document Format for Office Applications (OpenDocument) v1.0 (ISO/IEC 26300:2006, IDT) SWEDISH STANDARDS INSTITUTE
SVENSK STANDARD SS-ISO/IEC 26300:2008 Fastställd/Approved: 2008-06-17 Publicerad/Published: 2008-08-04 Utgåva/Edition: 1 Språk/Language: engelska/english ICS: 35.240.30 Information technology Open Document
8 < x 1 + x 2 x 3 = 1, x 1 +2x 2 + x 4 = 0, x 1 +2x 3 + x 4 = 2. x 1 2x 12 1A är inverterbar, och bestäm i så fall dess invers.
MÄLARDALENS HÖGSKOLA Akademin för utbildning, kultur och kommunikation Avdelningen för tillämpad matematik Examinator: Erik Darpö TENTAMEN I MATEMATIK MAA150 Vektoralgebra TEN1 Datum: 9januari2015 Skrivtid:
Fossilförbannelse? Filip Johnsson Institutionen för Energi och Miljö filip.johnsson@chalmers.se. Pathways to Sustainable European Energy Systems
förbannelse? Filip Johnsson Institutionen för Energi och Miljö filip.johnsson@chalmers.se Pathways to Sustainable European Energy Systems Fuel and Cement Emissions Global fossil fuel and cement emissions:
Grass to biogas turns arable land to carbon sink LOVISA BJÖRNSSON
Grass to biogas turns arable land to carbon sink LOVISA BJÖRNSSON Project funding and reporting, Thomas Prade & Mikael Lantz (2016) Grass for biogas - Arable land as carbon sink. Report 2016:280. Energiforsk,
Thesis work at McNeil AB Evaluation/remediation of psychosocial risks and hazards.
Evaluation/remediation of psychosocial risks and hazards. Help us to create the path forward for managing psychosocial risks in the work environment by looking into different tools/support/thesis and benchmarking
Grafisk teknik IMCDP. Sasan Gooran (HT 2006) Assumptions:
Grafisk teknik Sasan Gooran (HT 2006) Iterative Method Controlling Dot Placement (IMCDP) Assumptions: The original continuous-tone image is scaled between 0 and 1 0 and 1 represent white and black respectively
Manhour analys EASA STI #17214
Manhour analys EASA STI #17214 Presentatör Johan Brunnberg, Flygteknisk Inspektör & Del-M Koordinator Sjö- och luftfartsavdelningen Operatörsenheten Sektionen för teknisk operation 1 Innehåll Anmärkningen
Studieteknik för universitetet 2. Books in English and annat på svenska
Studieteknik för universitetet 2 Books in English and annat på svenska Inte bara svenska till engelska Vardagsspråk till akademiskt språk Böcker på engelska. Lektioner, diskussioner och tentor på svenska.
The Municipality of Ystad
The Municipality of Ystad Coastal management in a local perspective TLC The Living Coast - Project seminar 26-28 nov Mona Ohlsson Project manager Climate and Environment The Municipality of Ystad Area:
Measuring child participation in immunization registries: two national surveys, 2001
Measuring child participation in immunization registries: two national surveys, 2001 Diana Bartlett Immunization Registry Support Branch National Immunization Program Objectives Describe the progress of
Support Manual HoistLocatel Electronic Locks
Support Manual HoistLocatel Electronic Locks 1. S70, Create a Terminating Card for Cards Terminating Card 2. Select the card you want to block, look among Card No. Then click on the single arrow pointing
Isolda Purchase - EDI
Isolda Purchase - EDI Document v 1.0 1 Table of Contents Table of Contents... 2 1 Introduction... 3 1.1 What is EDI?... 4 1.2 Sending and receiving documents... 4 1.3 File format... 4 1.3.1 XML (language
Kundfokus Kunden och kundens behov är centrala i alla våra projekt
D-Miljö AB bidrar till en renare miljö genom projekt där vi hjälper våra kunder att undersöka och sanera förorenad mark och förorenat grundvatten. Vi bistår dig som kund från projektets start till dess
Schenker Privpak AB Telefon VAT Nr. SE Schenker ABs ansvarsbestämmelser, identiska med Box 905 Faxnr Säte: Borås
Schenker Privpak AB Interface documentation for web service packageservices.asmx 2012-09-01 Version: 1.0.0 Doc. no.: I04304b Sida 2 av 7 Revision history Datum Version Sign. Kommentar 2012-09-01 1.0.0
The present situation on the application of ICT in precision agriculture in Sweden
The present situation on the application of ICT in precision agriculture in Sweden Anna Rydberg & Johanna Olsson JTI Swedish Institute for Agricultural and Environmental Engineering Objective To investigate
Från N 1-kriteriet till en planering och drift av kraftnätet, grundad på sannolikheter
Från N 1-kriteriet till en planering och drift av kraftnätet, grundad på sannolikheter Gothia Power jubileumsseminarium den 19 november Liisa Haarla Aalto Universitet / Fingrid Oyj Innehållet N 1 kriteriet
Webbregistrering pa kurs och termin
Webbregistrering pa kurs och termin 1. Du loggar in på www.kth.se via den personliga menyn Under fliken Kurser och under fliken Program finns på höger sida en länk till Studieöversiktssidan. På den sidan
FÖRBERED UNDERLAG FÖR BEDÖMNING SÅ HÄR
FÖRBERED UNDERLAG FÖR BEDÖMNING SÅ HÄR Kontrollera vilka kurser du vill söka under utbytet. Fyll i Basis for nomination for exchange studies i samråd med din lärare. För att läraren ska kunna göra en korrekt
SVENSK STANDARD SS-ISO :2010/Amd 1:2010
SVENSK STANDARD SS-ISO 14839-1:2010/Amd 1:2010 Fastställd/Approved: 2010-11-08 Publicerad/Published: 2010-11-30 Utgåva/Edition: 1 Språk/Language: engelska/english ICS: 01.040.17; 17.160 Vibration och stöt
FOI MEMO. Jonas Hallberg FOI Memo 5253
Projekt/Project Security culture and information technology Projektnummer/Project no Kund/Customer B34103 MSB Sidnr/Page no 1 (5) Handläggare/Our reference Datum/Date Jonas Hallberg 2015-01-21 FOI Memo
CHANGE WITH THE BRAIN IN MIND. Frukostseminarium 11 oktober 2018
CHANGE WITH THE BRAIN IN MIND Frukostseminarium 11 oktober 2018 EGNA FÖRÄNDRINGAR ü Fundera på ett par förändringar du drivit eller varit del av ü De som gått bra och det som gått dåligt. Vi pratar om
COPENHAGEN Environmentally Committed Accountants
THERE ARE SO MANY REASONS FOR WORKING WITH THE ENVIRONMENT! It s obviously important that all industries do what they can to contribute to environmental efforts. The MER project provides us with a unique
Arbetstillfällen 100 000.
2 3 4 Arbetstillfällen 100 000. 5 6 7 Vissa anspråk ställs I de internationella direktiv och konventioner Sverige antingen är ålagt att följa eller frivilligt valt att följa. Här har jag listat några exempel
Uttagning för D21E och H21E
Uttagning för D21E och H21E Anmälan till seniorelitklasserna vid O-Ringen i Kolmården 2019 är öppen fram till och med fredag 19 juli klockan 12.00. 80 deltagare per klass tas ut. En rangordningslista med
Grafisk teknik. Sasan Gooran (HT 2006)
Grafisk teknik Sasan Gooran (HT 2006) Iterative Method Controlling Dot Placement (IMCDP) Assumptions: The original continuous-tone image is scaled between 0 and 1 0 and 1 represent white and black respectively
Projektmodell med kunskapshantering anpassad för Svenska Mässan Koncernen
Examensarbete Projektmodell med kunskapshantering anpassad för Svenska Mässan Koncernen Malin Carlström, Sandra Mårtensson 2010-05-21 Ämne: Informationslogistik Nivå: Kandidat Kurskod: 2IL00E Projektmodell
WindPRO version 2.7.448 feb 2010. SHADOW - Main Result. Calculation: inkl Halmstad SWT 2.3. Assumptions for shadow calculations. Shadow receptor-input
SHADOW - Main Result Calculation: inkl Halmstad SWT 2.3 Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look
Preschool Kindergarten
Preschool Kindergarten Objectives CCSS Reading: Foundational Skills RF.K.1.D: Recognize and name all upper- and lowercase letters of the alphabet. RF.K.3.A: Demonstrate basic knowledge of one-toone letter-sound
What Is Hyper-Threading and How Does It Improve Performance
What Is Hyper-Threading and How Does It Improve Performance Ali Muthanna, Lunds Universitet, IDA2, EDT621 Abstract Hyper-Threading (HT) is Intel s version of simultaneous multi-threading (SMT). Hyper-Threading
EASA FTL (Flygarbetstid)
EASA FTL EASA FTL (Flygarbetstid) Ett urval av reglerna Christer Ullvetter Transportstyrelsen i Norrköping 1 Air taxi operation New definition Air taxi operation means, for the purpose of flight time and
Klicka här för att ändra format
på 1 på Marianne Andrén General Manager marianne.andren@sandviken.se Sandbacka Park Högbovägen 45 SE 811 32 Sandviken Telephone: +46 26 24 21 33 Mobile: +46 70 230 67 41 www.isea.se 2 From the Off e project
CEDEC Annual konferens 15-10-2015
CEDEC Annual konferens 15-10-2015 The role of Swedish local DSO in creating flexibility in the energy value chain Elinorr Joint venture of 16 local grid operators according to the European public procurement
Robust och energieffektiv styrning av tågtrafik
1 Robust och energieffektiv styrning av tågtrafik - CATO - Forskning inom OnTime - Vidareutveckling och möjligheter KAJT, temadag om punktlighet 2014-11-13 Tomas Lidén Transrail Sweden AB Dagens trafikledning
Swedish adaptation of ISO TC 211 Quality principles. Erik Stenborg
Swedish adaptation of ISO TC 211 Quality principles The subject How to use international standards Linguistic differences Cultural differences Historical differences Conditions ISO 19100 series will become
SVENSK STANDARD SS-EN ISO 19108:2005/AC:2015
SVENSK STANDARD SS-EN ISO 19108:2005/AC:2015 Fastställd/Approved: 2015-07-23 Publicerad/Published: 2016-05-24 Utgåva/Edition: 1 Språk/Language: engelska/english ICS: 35.240.70 Geografisk information Modell
Händelser i kraftsystemet v v
Händelser i kraftsystemet v47 213 v13 214 Händelser i kraftsystemet > Låg förbrukning jämfört med tidigare vintrar. Effektreserv utnyttjades inte. > Fortum varit tvungen att ta flera tuffa kabelavbrott
Module 1: Functions, Limits, Continuity
Department of mathematics SF1625 Calculus 1 Year 2015/2016 Module 1: Functions, Limits, Continuity This module includes Chapter P and 1 from Calculus by Adams and Essex and is taught in three lectures,
Användarhandbok. MHL to HDMI Adapter IM750
Användarhandbok MHL to HDMI Adapter IM750 Innehåll Inledning...3 MHL to HDMI Adapter-översikt...3 Komma igång...4 Smart Connect...4 Uppgradera Smart Connect...4 Använda MHL to HDMI Adapter...5 Ansluta
1. Unpack content of zip-file to temporary folder and double click Setup
Instruktioner Dokumentnummer/Document Number Titel/Title Sida/Page 13626-1 BM800 Data Interface - Installation Instructions 1/8 Utfärdare/Originator Godkänd av/approved by Gäller från/effective date Mats
Innovation in the health sector through public procurement and regulation
Innovation in the health sector through public procurement and regulation MONA TRUELSEN & ARVID LØKEN 1 14/11/2013 Copyright Nordic Innovation 2011. All rights reserved. Nordic Innovation An institution
Rastercell. Digital Rastrering. AM & FM Raster. Rastercell. AM & FM Raster. Sasan Gooran (VT 2007) Rastrering. Rastercell. Konventionellt, AM
Rastercell Digital Rastrering Hybridraster, Rastervinkel, Rotation av digitala bilder, AM/FM rastrering Sasan Gooran (VT 2007) Önskat mått * 2* rastertätheten = inläsningsupplösning originalets mått 2
PFC and EMI filtering
PFC and EMI filtering Alex Snijder Field Application Engineer Wurth Elektronik Nederland B.V. November 2017 EMC Standards Power Factor Correction Conducted emissions Radiated emissions 2 Overview of standard
ERS (Electrical Road System) Slide-in project within FFI program
ERS (Electrical Road System) Slide-in project within FFI program FFI Fordonsstrategisk forskning och innovation What is slide-in? Slide-in, is a name that forsknings-, is used to innovations- explain,
12.6 Heat equation, Wave equation
12.6 Heat equation, 12.2-3 Wave equation Eugenia Malinnikova, NTNU September 26, 2017 1 Heat equation in higher dimensions The heat equation in higher dimensions (two or three) is u t ( = c 2 2 ) u x 2
Adding active and blended learning to an introductory mechanics course
Adding active and blended learning to an introductory mechanics course Ulf Gran Chalmers, Physics Background Mechanics 1 for Engineering Physics and Engineering Mathematics (SP2/3, 7.5 hp) 200+ students
Senaste trenderna inom redovisning, rapportering och bolagsstyrning Lars-Olle Larsson, Swedfund International AB
1 Senaste trenderna inom redovisning, rapportering och bolagsstyrning Lars-Olle Larsson, Swedfund International AB 2 PwC undersökning av börsföretag & statligt ägda företag Årlig undersökning av års- &
Datasäkerhet och integritet
Chapter 4 module A Networking Concepts OSI-modellen TCP/IP This module is a refresher on networking concepts, which are important in information security A Simple Home Network 2 Unshielded Twisted Pair
Aborter i Sverige 2008 januari juni
HÄLSA OCH SJUKDOMAR 2008:9 Aborter i Sverige 2008 januari juni Preliminär sammanställning SVERIGES OFFICIELLA STATISTIK Statistik Hälsa och Sjukdomar Aborter i Sverige 2008 januari juni Preliminär sammanställning
The reception Unit Adjunkten - for newly arrived pupils
The reception Unit Adjunkten - for newly arrived pupils Shortly on our work Number of received pupils: - 300 for school year 2014-2015 - 600 for school year 2015-2016 - 220 pupils aug-dec 2016 - ca. 45
Energimyndighetens titel på projektet svenska Utvärdering av solelproduktion från Sveriges första MW-solcellspark
w SAMMANFATTNING AV SLUTRAPPORT Datum 2016-01-22 Dnr 1 (5) Energimyndighetens titel på projektet svenska Utvärdering av solelproduktion från Sveriges första MW-solcellspark Energimyndighetens titel på
Windlass Control Panel v1.0.1
SIDE-POWER Windlass Systems 86-08950 Windlass Control Panel v1.0.1 EN Installation manual Behåll denna manual ombord! S Installations manual SLEIPNER AB Kilegatan 1 452 33 Strömstad Sverige Tel: +46 525
SkillGuide. Bruksanvisning. Svenska
SkillGuide Bruksanvisning Svenska SkillGuide SkillGuide är en apparat utformad för att ge summativ återkoppling i realtid om hjärt- och lungräddning. www.laerdal.com Medföljande delar SkillGuide och bruksanvisning.
Hållbar utveckling i kurser lå 16-17
Hållbar utveckling i kurser lå 16-17 : Jag tillhör akademin / My position is in the School of Jag tillhör akademin / My position is in the School of Humaniora och medier / Humanities and Media Studies
1. Compute the following matrix: (2 p) 2. Compute the determinant of the following matrix: (2 p)
UMEÅ UNIVERSITY Department of Mathematics and Mathematical Statistics Pre-exam in mathematics Linear algebra 2012-02-07 1. Compute the following matrix: (2 p 3 1 2 3 2 2 7 ( 4 3 5 2 2. Compute the determinant
Enterprise App Store. Sammi Khayer. Igor Stevstedt. Konsultchef mobila lösningar. Teknisk Lead mobila lösningar
Enterprise App Store KC TL Sammi Khayer Konsultchef mobila lösningar Familjen håller mig jordnära. Arbetar med ledarskap, mobila strategier och kreativitet. Fotbollen ger energi och fokus. Apple fanboy
Gradientbaserad Optimering,
Gradientbaserad Optimering, Produktfamiljer och Trinitas Hur att sätta upp ett optimeringsproblem? Vad är lämpliga designvariabler x? Tjockleksvariabler (sizing) Tvärsnittsarean hos stänger Längdmått hos
Könsfördelningen inom kataraktkirurgin. Mats Lundström
Könsfördelningen inom kataraktkirurgin Mats Lundström Innehåll Fördelning av antal operationer utveckling Skillnader i väntetid Effekt av NIKE Skillnader i synskärpa före operation Skillnader i Catquest-9SF
Läkemedelsverkets Farmakovigilansdag
Swedish Medical Products Agency s Patient- and Consumer Advisory Board Brita Sjöström May 29, 2018 Patientrådet@mpa.se https://lakemedelsverket.se/patient-konsument-rad The vision of the Swedish Medical
HANTERING AV UPS CX
HANTERING AV UPS CX2100-0904 Hantering av UPS-modulen CX2100-0904. I WES7 och TwinCAT 2. Inställning av UPS:en i WES7 UPS:ens konfigurationsflik Inställningsmöjligheterna för hur UPS:en beter sig finns
Isometries of the plane
Isometries of the plane Mikael Forsberg August 23, 2011 Abstract Här följer del av ett dokument om Tesselering som jag skrivit för en annan kurs. Denna del handlar om isometrier och innehåller bevis för