Heavy Transport on Existing Lines: the Assessment of Bearing Capacity of Track-bed based on Track Stiffness Measurements and Theoretical Studies

Relevanta dokument
SVENSK STANDARD SS-ISO :2010/Amd 1:2010

Parking garage, Gamletull. MDM-piles, pre-installation testing RÄTT FRÅN GRUNDEN!

Custom-made software solutions for increased transport quality and creation of cargo specific lashing protocols.

CHARMEC project SP13 Alarm limits for wheel damage / Larmgränser för hjulskador

Sara Skärhem Martin Jansson Dalarna Science Park

Workshop 25 oktober 2017

EASA Standardiseringsrapport 2014

PORTSECURITY IN SÖLVESBORG

A study of the performance

E4 Sundsvall Sundsvallsbron

DVA336 (Parallella system, H15, Västerås, 24053)

PRESTANDADEKLARATION. Nr 0015 SV

Lösenordsportalen Hosted by UNIT4 For instructions in English, see further down in this document

Kursplan. FÖ1038 Ledarskap och organisationsbeteende. 7,5 högskolepoäng, Grundnivå 1. Leadership and Organisational Behaviour

RAPPORT Tunga transporter på befintlig järnväg, bärighetskrav och bärighetsåtgärder. Projektnummer:

Gradientbaserad Optimering,

SOLAR LIGHT SOLUTION. Giving you the advantages of sunshine. Ningbo Green Light Energy Technology Co., Ltd.

PORTSECURITY IN SÖLVESBORG

Measuring child participation in immunization registries: two national surveys, 2001

Resultatkonferens Välkommen!

Dokumentdatum. Sidor 2(9)

Module 1: Functions, Limits, Continuity

PFC and EMI filtering

Modeling of pore pressure in a railway embankment

D-RAIL AB. All Rights Reserved.

Image quality Technical/physical aspects

Ett jämställt transportsystem - vad är det och hur långt har vi kommit?

FÖRBERED UNDERLAG FÖR BEDÖMNING SÅ HÄR

säkerhetsutrustning / SAFETY EQUIPMENT

Affärsdokumentspecifikation Publiceringsdatum: Version: 1.2

Ringmaster RM3 - RM 5 RM3 RM 4 RM 5

Sveriges internationella överenskommelser

Tunga metaller / Heavy metals ICH Q3d & Farmakope. Rolf Arndt Cambrex Karlskoga

Measuring void content with GPR Current test with PaveScan and a comparison with traditional GPR systems. Martin Wiström, Ramboll RST

Module 6: Integrals and applications

PRESTANDADEKLARATION. DoP: 0146 för fischer Betongskruv ULTRACUT FBS II (Metallankare för användning i betong (kraftig typ)) SV

Kursplan. FÖ3032 Redovisning och styrning av internationellt verksamma företag. 15 högskolepoäng, Avancerad nivå 1

Kursplan. NA3009 Ekonomi och ledarskap. 7,5 högskolepoäng, Avancerad nivå 1. Economics of Leadership

Kundfokus Kunden och kundens behov är centrala i alla våra projekt

PRESTANDADEKLARATION. Nr 0019 SV. bilagor B 1 - B 9

Grafisk teknik IMCDP IMCDP IMCDP. IMCDP(filter) Sasan Gooran (HT 2006) Assumptions:

SVENSK STANDARD SS-EN 13612/AC:2016

Stiftelsen Allmänna Barnhuset KARLSTADS UNIVERSITET

District Application for Partnership

Digital Personvåg MANUAL H

Snitsa förvaring / storage

Ett spårvänligt tåg (A track friendly train) Evert Andersson, Kungliga Tekniska Högskolan (KTH) Rickard Persson, KTH och Bombardier Transportation

Grafisk teknik IMCDP. Sasan Gooran (HT 2006) Assumptions:

High-Speed Rail in Sweden - Actual plans

Grafisk teknik. Sasan Gooran (HT 2006)

Komponenter Removed Serviceable

Avdelningen för BYGG. -konstruktion och produktion Vid Institutionen för Samhällsbyggnad och Naturresurser

Anställningsprofil för universitetslektor i matematikämnets didaktik

Förbättring av bärighet hos befintliga järnvägsanläggningar

The Municipality of Ystad

Arbetstillfällen

Botnia-Atlantica Information Meeting

Dokumentnamn Order and safety regulations for Hässleholms Kretsloppscenter. Godkänd/ansvarig Gunilla Holmberg. Kretsloppscenter

Kursplan. EN1088 Engelsk språkdidaktik. 7,5 högskolepoäng, Grundnivå 1. English Language Learning and Teaching

Det här med levels.?

Solar eclipse (Friday)

3 rd October 2017

P650 - Takscreen. Installationsguide EN

Viktig information för transmittrar med option /A1 Gold-Plated Diaphragm

ISO STATUS. Prof. dr Vidosav D. MAJSTOROVIĆ 1/14. Mašinski fakultet u Beogradu - PM. Tuesday, December 09,

Olika uppfattningar om torv och

SVENSK STANDARD SS-EN ISO

Oförstörande provning (NDT) i Del M Subpart F/Del 145-organisationer

Swedish framework for qualification

Solcellsanläggningar i världsklass en workshop om prestanda och tillförlitlighet

RUP är en omfattande process, ett processramverk. RUP bör införas stegvis. RUP måste anpassas. till organisationen till projektet

8 < x 1 + x 2 x 3 = 1, x 1 +2x 2 + x 4 = 0, x 1 +2x 3 + x 4 = 2. x 1 2x 12 1A är inverterbar, och bestäm i så fall dess invers.

Accepterad monteringsanvisning 2016:1. Metris (RSK: ) Metris S (RSK: ) Metris (RSK: )

Brandsäkerhet hos. ny europeisk handbok

Alias 1.0 Rollbaserad inloggning

Documentation SN 3102

SAMMANFATTNING AV SUMMARY OF

Metodprov för kontroll av svetsmutterförband Kontrollbestämmelse Method test for inspection of joints of weld nut Inspection specification

Vejdimensionering som bygger på observationsmetodik

Running Dynamics for a Maintenance Railway Vehicle

Civilingenjörsexamen

7!34% 7!34% !34% 52-53,/

SVENSK STANDARD SS-EN 828

SVENSK STANDARD SS-EN ISO 11734

RADIATION TEST REPORT. GAMMA: 30.45k, 59.05k, 118.8k/TM1019 Condition D

D-vitamin. Näringsrekommendationer

Application for exemption - Ansökan om dispens

Accepterad monteringsanvisning 2016:1. Talis S (RSK: ) Talis S (RSK: ) 1 (12)

Accepterad monteringsanvisning 2016:1

Accepterad monteringsanvisning 2016:1. Talis S (RSK: ) Talis S 100 CoolStart (RSK: )

Kvalitativ rörelseanalys. Kvantitativ rörelseanalys Kinematik Kinetik. Biomekanik. Idrottsmedicin ur ett tvärprofessionellt perspektiv

Accepterad monteringsanvisning 2016:1. Ecos M CoolStart (RSK: ) Ecos L CoolStart (RSK: ) 1 (12)

PRESTANDADEKLARATION. Nr 0009 SV

FIX LED-LYSRÖRSARMATUR MED AKRYLKÅPA IP44

Accepterad monteringsanvisning 2016:1. Focus (RSK: ) 1 (12)

Mätosäkerhet och kundlaster

Accepterad monteringsanvisning 2016:1. Focus (RSK: ) Focus 100 CoolStart (RSK: ) (RSK: )

Om oss DET PERFEKTA KOMPLEMENTET THE PERFECT COMPLETION 04 EN BINZ ÄR PRECIS SÅ BRA SOM DU FÖRVÄNTAR DIG A BINZ IS JUST AS GOOD AS YOU THINK 05

NORDIC GRID DISTURBANCE STATISTICS 2012

Transkript:

19th Nordic Seminar on Railway Technology, 14-15 September 2016, JVTC, Luleå Heavy Transport on Existing Lines: the Assessment of Bearing Capacity of Track-bed based on Track Stiffness Measurements and Theoretical Studies Martin Li and Alexander Smekal Trafikverket, Underhåll, Teknik och Miljö S-781 89 Borlänge, Sweden Telefon: +46 705985637 Email: martin.li@trafikverket.se 1

TRV FoU-projekt: Tunga Transporter på Befintlig Järnväg, Bärighetskrav och Bärighetsåtgärder Projektets syfte Fastställa erforderlig bärighet för tunga transporter (banöverbyggnad och underbyggnad) Föreslå bärighetsåtgärder för att säkerställa framkomlighet av tunga transporter Interna deltagare Alexander Smekal (Projektledare, geoteknik) Eskander Bashiry (Mark- och geoteknik) Sven-Erik Wall (Spårteknik) Martin Li (Spårteknik), - teoretiska studie Externa resurser: Styvhetsmätning med IMV 100 (InfraNord, EBER Dynamics, Eric Berggren) Mätning av bärighet med fallvikt (Konsult & Utveckling AB) Mätning av nedböjning av spår och laster (Damill, Lars Larsson) Övervakning och hjälparbete (InfraNord) 2

Bearing Capacity and/or Bärighet? Bearing capacity is the capacity of soil to support the loads applied to the ground. The bearing capacity of soil is the maximum average contact pressure between the foundation and the soil which should not produce shear failure in the soil. (from Wikipedia, English) Bärighet är ett vägtekniskt begrepp som anger högsta last, enstaka eller ackumulerad, som kan accepteras med hänsyn till risk för sprickor eller deformationer. (från Wikipedia, Svenska) In Sweden, the requirements for bearing capacity are set only for roads In other countries, the requirements for bearing capacity are also set for railways!!! Bearing capacity: good or bad??? 3

DB s requirements for Bearing Capacity: Ev2 modulus 4

Vehicles considered Shimmns 920 P=22.5 t, V = 120 km/h Q73 Uaai-xxy P = 22.8 t, V = 40 km/h Smmnps 960, P = 25 t, V = 100 km/h Sgmns-w 982 P=25 t, V = 100 km/h Laaps 013 P=25 t, V = 100 km/h Malmvagn Uno P = 30 t, V = 60 km/h 5

6 Track considered: bdl 391

Zimmermann-Eisenmanns theory w Q 2kL x L x L x / L x e cos sin ; x 0 r DAF,, max r mean 7

Improvement 1: Ballast Coefficient Csb Mätvagn IMV 100 Quality of track support Foundation modulus C Unit Poor Good [N/mm3] 0.02 0.20 Esveld: Modern Railway Track, (page 79) Standard method Proposed method in this study 8

Track stiffness measured by IMV 100 (EVS-method by EBER) Spårstyvhet för Bdl 391 utvärderas från IMV 100 mätningsresultat blg_fv_data.mat mjukt! 9

Improvement 2: DAF DAF 1 t V 60 1 t 1 160 V V 60 60 km/h km/h t Application Track condition φ 1 Contact stress, subgrade Very good 0.1 2 Lateral load, ballast load Good 0.2 3 Rail stresses, fastenings, supports Bad 0.3 Esveld: Modern Railway Track, (page 84) Standard method Proposed method in this study 10

Bärighetsutvärdering baserat på IMV 100 mätningar Spårdata för Bdl 391 Frövi-Ställdalen från BIS och OPTRAM Spårläge har försämrats under åren 2012-2014! 11

12 Bärighetsutvärdering baserat på IMV 100 mätningar Simuleringsresultat för Bdl 391: Spänningar och nedböjningar i rälen

13 Bärighetsutvärdering baserat på IMV 100 mätningar Simuleringsresultat för Bdl 391: Spänningar och nedböjningar i sliprar

Bärighetsutvärdering baserat på IMV 100 mätningar Simuleringsresultat för Bdl 391: Spänningar i ballast och 30 cm under ballast 14

Bärighetsutvärdering baserat på IMV 100 mätningar Utvärderingar på sträckan km 407-409 σ bf max σ bf = 0.006E v2 1 + 0.7logn N mm2 Rail Substructure 30 cm under sleeper 15

Bärighetsutvärdering baserat på IMV 100 mätningar Utvärderingar på hela Bdl 391 Frövi-Ställdalen Shimmns 920 Q73 Uaai-xxy Smmnps 960 Laaps 012/013 16

Concluding remarks A study on the assessment of bearing capacity of track-bed concerning heavy transport on existing lines has been carried out, based on: Zimmermann/Eisenmann s theory track stiffness measurements by IMV100 OPTRAM-data for track geometry quality BIS-data for track components, STH, curvature and cant The results include: stresses in rail (σ r max ) and displacement of rail (w r max ) stresses between rail and sleeper ( σ rs max ) and displacement of sleeper (w s max ) stresses between sleeper and ballast (σ sb max ) Stresses at the level of 30 cm under sleeper (σ bf max ) The study indicates those sections in Bdl 391 having insufficient bearing capacity due to: track stiffness is too low track geometry quality is not good enough or a combination of both 17

Recommendations At the level of 30 cm under sleeper, the requirements on bearing capacity of track-bed are suggested: For stresses in rail to be within limit E v2 min = 50 Mpa For achieving a good bearing capacity E v2 min = 70 Mpa Optimal value E v2 opt = 120 Mpa Other recommendations: RAPPORT: Tunga transporter på befintlig järnväg, bärighetskrav och bärighetsåtgärder, ISBN 978-91-7467-990-8 18