Protokoll fört vid enskild föredragning Infrastrukturavdelningen Transportbyrån, I2

Relevanta dokument
Protokoll fört vid enskild föredragning

MCP-16RC, Air Purification

Plain A262. För T16 (T5) lysrör. Innehåll. Monteringsanvisning. A. Instruktion för rampmontering

DAMPER EQAZ-12, EQAZ-13, STAZ-30, STBZ-30

Dokumentnamn Order and safety regulations for Hässleholms Kretsloppscenter. Godkänd/ansvarig Gunilla Holmberg. Kretsloppscenter

Monteringsanvisning Installation instructions

Metodprov för kontroll av svetsmutterförband Kontrollbestämmelse Method test for inspection of joints of weld nut Inspection specification

Installation Instructions

säkerhetsutrustning / SAFETY EQUIPMENT

VÄRILLISIÄ KUVIA ALUKSISTA. ESL Shipping - Framtidens sjöfart

Angående erhållande av behörighet som fartygselektriker

Rev No. Magnetic gripper 3

Blandarkar med tömningslucka

BOW. Art.nr

3 rd October 2017

Montageanvisning Airway system 1000/1500 Assembly instruction Airway system 1000/1500

Information technology Open Document Format for Office Applications (OpenDocument) v1.0 (ISO/IEC 26300:2006, IDT) SWEDISH STANDARDS INSTITUTE

Windlass Control Panel v1.0.1

Utfärdad av Compiled by Tjst Dept. Telefon Telephone Datum Date Utg nr Edition No. Dokumentnummer Document No.

Questionnaire for quotation Asylum accommodation

GGP ENGINE SM70 Model Year 2010/2011

Technical description with installation and maintenance instructions

GOLD SD Med styrenhet/with control unit. Fläkt 1A/B/ Fan 1A/B. Fläkt 2A/B/ Fan 2A/B. Fläkt/ Fan. Utan filter/ Without filter

Accomodations at Anfasteröd Gårdsvik, Ljungskile

GOLD SD Med styrenhet/with control unit. Fläkt/ Fan. Utan filter/ Without filter. Fläkt/Fan. Fläkt/ Fan. Med filter/ With filter.

Montageanvisning Airway system 1000/1500 Assembly instruction Airway system 1000/1500

PORTSECURITY IN SÖLVESBORG

Nathi Skötbord Changing unit Table à langer murale Wickeltisch Verschoontafel Puslebord Cambiador de pared Přebalovací pult Fasciatoio

GOLD SD Fläkt 2/ Fan 2. Fläkt 1/ Fan 1. Fläkt/ Fan. Utan filter/ Without filter. Fläkt 1/ Fan 1. Fläkt 2/ Fan 2. Med filter/ With filter Filter

GOLD SD eff.var./cap.var.120-1

Tomas Stålnacke Huvudprojektledare Project Manager Stadsomvandlingen City in transformation Kirunabostäder AB

KOMPLETTERING OCH GUIDE TILL ISF-JOURNALEN

ARC 32. Tvättställsblandare/Basin Mixer. inr.se

SVENSK STANDARD SS-ISO :2010/Amd 1:2010

Users manual Bruksanvisning Gebrauchanweisung Guide d instructions

Företagsnamn: Grundfos Skapad av: Magnus Johansson Tel: +46(0) Datum:

Day 1: European Cooperation Day 2017

AirCare - Bakteriekontroll i offentliga utrymmen

CompactAIR Center Ventilation - Filtrering - Uppvärmning CompactAIR Center Ventilation - Filtration - Heating

Ersättning styrkort GOLD, stl 1-3, Version 1-3/ Replacement control circuit board GOLD, sizes 1-3, Version 1-3

Ringmaster RM3 - RM 5 RM3 RM 4 RM 5

SVENSK STANDARD SS :2010

TEXTURED EASY LOCK BLOCK INSTALLATION GUIDE. australianpaving.com.au

Monteringsanvisning Nödutrymningsbeslag ASSA 179E

3HAC ABB Robotics. Figur 1. Separatoravdragare och separator. Assembly Instruction. Maintenance instruction. Underhållsinstruktion

Your No. 1 Workout. MANUAL pro

Reservdelskatalog Parts Catalogue SM 50 - LC154FS /0 - Season 2016

Anvisning för Guide for

GH 130, GH 200, GH230, GH 300, hydrauliska sprutningssystem

Transformator konferens Stavanger /4 Sammanställning av kunskapsläget I Vattenfall och utvecklingen I Sverige

Svenska()(Bruksanvisning(för(handdukstork()(1400(x(250(mm(

GOLD SD 100, eff.var./cap.var. 2

Storlek/ Size. Modell/ Model. Effekt/ Effect. Vattenmängd/ Water amount T30 63W T30 87W T30 67W T30 76W T30 108W T30 121W

BBT057/ BBC057 BBCD057/ BBT057-NL HOLDEN COLORADO 9/2016+ HOLDEN TRAILBLAZER WD & 4WD Models

Utfärdad av Compiled by Tjst Dept. Telefon Telephone Datum Date Utg nr Edition No. Dokumentnummer Document No.

Discovery FSQ, IAA Utgåva/Edition 11. SE Habo. Klass 2 IAA FSQ-I 26W. 4 mm c c mm N L

MONTERINGSINSTRUKTION ASSEMBLY INSTRUCTION

Flänsar och rördelar i rostfria och svarta stål. Flanges and fittings in stainless and carbon steel

SUZUKI GRAND VITARA 3P CITY 2011»

Reservdelskatalog Parts Catalogue COMBI 40 AE /S15 - Season 2017

Instruktioner för Service / Instructions for Service

Får endast utföras av behörig personal. May only be carried out by authorized electrician

GigaCom AB Säterigatan Göteborg

Slangupprullare Hose reels

Support Manual HoistLocatel Electronic Locks

Kamrör / Ribbed pipe radiator

Livslängdsbedömning och livslängdsförlängning på turbiner Oskar Mazur

Protokoll fört vid enskild föredragning Infrastrukturavdelningen Vägnätsbyrån

Viktig information för transmittrar med option /A1 Gold-Plated Diaphragm

LINC MODELL 13. INR SVERIGE AB Kosterögatan 15 SE Malmö 13 EN 1428:2005+A1:2008

TN LR TT mg/l N b) 2,6-Dimethylphenole

Module 6: Integrals and applications

Reservdelskatalog Parts Catalogue TM 60 - LC165FT /0 - Season 2016

PORTSECURITY IN SÖLVESBORG

PRESS FÄLLKONSTRUKTION FOLDING INSTRUCTIONS

7!34% 7!34% !34% 52-53,/

GJUTEN ALUMINIUMPLATTA EN AW 5083 CAST ALUMINIUM PLATE EN AW 5083

SAFETY PRECAUTIONS SPECIFICATIONS

GOLD SD 100, eff.var./cap.var. 1

SBF 127 Information

BBT042/ BBC042/ BBCD042 NISSAN NAVARA D40 V STX & PATHFINDER R WD & 4WD Models

Beijer Electronics AB 2000, MA00336A,

Kontroll före idrifttagning

Lösenordsportalen Hosted by UNIT4 For instructions in English, see further down in this document

Bruksanvisning Directions for use

GOLD SD/CX 120, eff.var./cap.var. 2

SAFETY PRECAUTIONS SPECIFICATIONS

CCTV eller dispens? Vad göra åt kravet på övervakning av området utanför cockpit från båda pilotstolarna?

Slangupprullare. Hose Reels

Instruction Manual. Svenska, English. Power Bank. Model: PRBN

Byggdokument Angivning av status. Construction documents Indication of status SWEDISH STANDARDS INSTITUTE

GOLD SD 04/05, 07/08, 11 eff.var./cap.var. 1

Komponenter Removed Serviceable

BRIC MODELL A

INVERTER MULTIPROCESS MIG/MAG-TIG-MMA

Surfaces for sports areas Determination of vertical deformation. Golvmaterial Sportbeläggningar Bestämning av vertikal deformation

WAVES4POWER Fosnavåg 24 oktober 2016


Transkript:

PROTOKOLL Nummer 26 3.6.2019 Sammanträdesdatum Protokoll fört vid enskild föredragning Infrastrukturavdelningen Transportbyrån, I2 Beslutande Föredragande Justerat Minister Mika Nordberg Teknisk inspektör Magnus Eriksson Omedelbart............................ Ärende/Dnr/Exp. Beslut Nr 34 Dockning av m/s Alfågeln 2019 ÅLR 2019/4274 Beslut Landskapsregeringen beslöt att begära in anbud på dockning för m/s Alfågeln från Stockholms Reparationsvarv Ab, Oy Western Ship Yard Ltd och Turku Repair yard enligt bifogad dockningsspecifikation i bilaga I219E26. Det beräknade värdet för entreprenaden överstiger inte det av Europeiska kommissionen fastställda tröskelvärdet för upphandling av tjänster och varor om 221 000 euro exklusive moms. vilket medför att upphandlingen genomförs enligt Ålands landskapsregerings beslut (2018:13) gällande vissa upphandlingar. I enlighet med 4 sker upphandlingen genom riktat förfarande. Upphandlingen med tillhörande anbudshandlingar kommer att publiceras på landskapsregeringens elektroniska upphandlingsverktyg www.eavrop.com. Kostnaderna belastar moment 75010 Upphandling av sjötrafik och 975000 Fartygs- och färjeinvesteringar. Motivering Dockningen är en del av det planerade löpande underhållet som görs av fartyget för att säkerställa en säker och störningsfri trafik. Enligt klassningssällskapets regler ska fartyget torrsättas två gånger inom en femårsperiod och längsta intervallen mellan dockningarna får ej överstiga tre år. M/s Alfågeln dockades senast 09.2014 och 10.2017. Bakgrund M/s Alfågeln är driftsprivatiserad. Enligt entreprenadavtalet ansvarar för och bekostar beställaren för klassningar samt alla torrdockningar och reparationer som inte är förorsakade av bristande löpande underhåll eller försumlighet av entreprenören. Entreprenören ansvarar för leverans samt hämtning av fartyget vid dockningar från av beställaren angiven plats. Platsen är begränsad till att vara belägen inom en radie av 120 sjömil från färjelinjen.

2 (2) Stockholms Reparationsvarv Ab, Oy Western Ship Yard Ltd och Turku Repair yard är de mest lämpade reparationsvarven inom en radie av 120 sjömil från färjelinjen.

Bilaga I219E26 Phone:+358 18 25000 Dockningsspecifikation M/S Alfågeln 2019 Period V37-39 Main Data Length 52,7 m Wide 12,0 m GT 1469 DW 300 Maine engine 1*2600 kw Wärtsilä 16V22 Klass Lloyd Electricity 400 / 220 50 Hz Year of built 1990, Simek A/S 1

Terms and Conditions A. This docking specification is intended to describe work that will be carried out at the docking as detailed as possible so that it is possible to submit tenders either at a fixed price or at a running price. B. We reserve the right to perform the work on the specification partly or to omit work in its entirety. C. We reserve the right to employ subcontractors under our own control which may prove necessary for special competence and specialist knowledge, both with respect to parts of this specification and any additional work. D. In addition to the mentioned work in this docking specification there may be deviations such as e.g. construction of work stands, cleaning, disposal of waste, drainage of tanks, work lights and fire guards, etc. E. In the case of repairs of machinery or equipment, the manufacturer's instructions and recommendations are to be followed. F. All work must be approved by the shipping company's technical superintendent or a person appointed by him. 2

100 Arrival, general works and docking Docking and all works shall be performed during period 10.09.2019-27.09.2019 and not exceed 14 days. 101 In-/Out docking Including first day in the dock and rebuilding of docking bed First day in dock is the first full 24h period started from 00:00. 102 Docking rent Price per day / day /day 103 General service Gang Way Garbage container for waste including disposal /m 3 Garbage container for kitchen waste including disposal /m 3 Disposal of empty paint cans Disposal of other paint waste /m 3 Disposal of waste and sludge oil /m 3 Emptying of waste and sludge oil, rental by the hour for work with vacuum truck including one man Emptying of bilge, rental by the hour for work with vacuum truck including one man Disposal of bilge water /m3 In / out connection of fire line to the vessel Delivery of cooling water (distilled) /m 3 In / out connection of fresh water to the vessel Delivery of fresh water /m 3 Emptying of black and gray water, rental by the hour with vacuum truck including one man Disposal of black and gray water /m 3 Cleaning of black and gray water tanks /m 3 tank In / out connection of compressed air Supply of compressed air /day 104 Shore connection: 400 V, 50 Hz, 100A Shore connection Price of electricity /kwh 105 Crane for vessel use Including crane operator 106 Rent of Sky lift (20m), for use by the ship (Including delivery up to the ship) 3

107 Debiting by the hour for specified work in this specification, and for additional work: Overtime weekday % Overtime holiday % Welder Steel-worker Mechanic/engineer Plumber Painter Electrician Fireguard Cleaner Sheet-metal worker Carpet layers and floor work Interior insulation work Interior work (ceiling and wall covering) 200 Washing, Sand blasting and painting Note! If no other agreement is done with owner s technical superintendent (TSP), it is mandatory to follow the paint manufacturer application instructions (appendix to this specification). Before any surface is painted it shall be inspected and approved for painting by owner s TSP. All scruppers, hull penetrations, echosounders, propeller, Zink anodes etc. must be cowered and protected before any sand blasting and painting is performed. An agreement shall be taken with owner s TSP if any Fan duct from machinery spaces and interior HVAC unit shall be covered before blasting and painting. All above mentioned covering and protection shall be removed after finished work. All work with sky-lift and crane shall be included in washing. Underwater hull: 670 m² Boottop and fender list: 150 m² Ship outside: ~640m 2 201 HP washing Underwater hull, bootop, fender list 820 m². Additional cost for sea growth /m² 202 Sand blasting Sandblasting of underwater hull, bootop and fenderlist SA 2 ½ ~820 m² 4

203 Minor sand blasting Minor sand blasting work including blasting grit 204 Painting of underwater hull, bootop and fenderlist Painting of hull, bootop and fenderlist ~820 m 2 according to paint suppliers instruction. Paint will be supplied by ship owner 205 Painting of hull marks Painting of draft marking, plimson mark and side thruster marking 206 Protection/covering before sand blasting and painting Covering of scruppers, hull penetrations, echosounders, propeller, Zink anodes etc. 207 Flushing before depature Flushing with firehose of deck and ship outside before departure from yard 208 Bottom plug Opening and closing, including new sealing Fixed price 209 Sea chest Opening and closing of strainer, HP washing of sea chest, sand blasting SA 2 1/2 and painted according to paint manufacturer instruction, antifouling, protection of hull penetration, scaffolding. Paint will be supplied by shipowner. Sea chest #8-10, fixed price Sea chest #18-21, fixed price Sea chest #62-63, fixed price 210 AFT peak tanks Ballast tank No.10,11 (SB/BB 5) to be sandblasted SA 2 ½ and painted according to paint manufacturer instruction (320 NDFT). Tank volyme 14m 3. Fixed price incl. technical opening. Paint will be supplied by shipowner. 5

300 Steelwork, visor, ramps, doors and tanks 301 Hull Welding Repair welding of weldseams at bottomplates and bow thruster tunnel. 302 Ventilation pipe Steering gear room ventilation pipe stay to be repaired. Fixed price after inspection at yard. 303 Car deck doors Sliding rail and door train at car deck doors to be repaired 304 FWD car ramp Old ramp to be replaced with a new prefabricated. Hinges plates on hull to be renewed. Special attention must be taken for hinges to be in straight in line. Fixed price including all material, sand blasting and painting of hinges. 305 Zink anode Replacement of anodes on hull, thruster tunnel, sea chest. Price to include new anodes, removal of old anode and welding of new anodes. 2 kg 3,5 kg 5 kg 7,5 kg 10 kg 306 Manhole Opening/closing of manhole hatch 307 Gaskets for manhole Delivery of new gaskets 308 Bottom plug Opening and closing of bottom plug including new gasket 309 Measurement of Bow visor hinges Hinges clearance to be measured, report given in three copies 6

Repair work of hinges 310 Sludge tank level gauge Renew of sludge tank level gauge New level gauge to be delivered by shipowner 400 Engine and mechanical work Maine engine Wärtsilä 16V 22 401 Engine crankshaft Control of crankshaft alignment before docking Report to be given in tree copies. 402 Main engine overhaul Engine will be overhauled by shipowner subcontractor. Mechanical assistance 500 Propeller, Propeller shaft and Rudder 501 Outer Simplex seal Type: Simplex Compact seal size 355. Replacement of old seal: Seal to be renewed, new to be installed by vulcanisation without shaft withdraw. Removal of ropeguard, emptying of sterntube oil and filling with new oil, disposal of old oil. Seal to be replaced and vulcanise by certificated (SKF/simplex) mechanic. New ropeguard to be installed according to drawing 025-763-301-1 B, appendix XXX Simplex measurement to be taken before and after seal replacement, report to be given in tree copies. 502 Rudder Rudder to be removed and pressure tested, lower bearing bush renewing, rudder pintel to be refurbished. Appendix xxx 600 Pipes and Valves 601 Scupper pipe Renewing of pipe, DN 25 appr. 6 m, from scupper at saloon deck centre Aft ship. To get access to pipe steel sheet lining at car deck roof must be dismantled. Fixed price after inspection 7

602 Fire line pipe Renewal of appr. 2m fire line pipe DN80 Fixed price after inspection 603 Working air pipes Renewing of airpipes at car deck, fixed price after inspection 604 Green Oil filter installation Installation of Green Oil filter module according to manufacture installation instructions Pipe work Electrical installation 605 Bottom- and overboard valves Price including Opening/closing of valve bonnet, Cleaning of valve clack box, lite grinding of sealing surface, renewing of bonnet gasket. DN 200 DN 150 DN 125 DN 100 DN 80 DN 65 DN 50 DN 15 700 Safety equipment 701 Replacement of life rafts model 6*25 pers. Viking life rafts to be removed, old steel storing construction for raft to be removed. New 153 pers. raft with rack shall be installed according to ship owner s instruction. Raft and rack will be supplied by shipowner. Fixed price after inspection 800 Deck machinery 702 Anchor, chain and windlass machinery Chain cables to be ranged and measured, report in three copies, including all associated work to make measurement possible. 703 Chain locker 8

Chain locker bottom lining to be removed and deck to be sandblasted to SA 2 1/2 and painted, apr. 2,3 m 2. 900 Interior and Miscellaneous 901 Thickness measurement Thickness measurement according to class surveyor assignation, Measurement and measurement report given in three copies and one electrical (.PDF) /spot 902 Toilet alarm Installation of disable toilet alarm (Type ELKO RCW-set E55 045 20) at saloon deck disable toilet, cable routing from toilet to bridge intended for toilet alarm on bridge. Installation of armature and cable routing according to instruction 903 Automatic door opening SB passenger saloon deck door between saloon and aft deck to be provided with automatic door opener operated via push buttons mounted on bulkheads inside the saloon and outside on the aft deck. The pushbuttons, type ATECO AK-3 outdoor, ATECO AK-2 indoor, to be placed adapted for wheelchair users and at a height of 900 mm measured from floor to top button. Cable routing for remote door opening and manoeuvring power for door openers are drawn. Location of push buttons and cabling according to crew instructions.. installation door opener Material: Door opener with mounting kit, 1 pc. inside, 1 piece. outside Elbow contact 904 Cable routeing Network cable for information displays in passenger saloon to be routed between bridge and passenger saloon according to crew instructions. Interior work Cabling Cable will be delivered by ship ovner. 905 Bilge cleaning Bilges to be cleaned, lot of paint flakes in bilges Mariehamn 17.05.2018 9

Magnus Eriksson Teknisk inspektör 10