En ny digital basindustri Anders Granberg, Strategic Advisor CEO Anders Granberg AB
Facebook s Pioneer Data Center Investment! The hub for Facebook s EMEA operations. First outside US! The largest data center of its kind in Europe! The northernmost of this magnitude on Earth! Occupies an area of 3 x 28 000 m2/33 488 yd2! A max effect of 120 MW when finalized! 100 % run by hydropower! Reduces the number of backup generators by 70 percent, compared to US data centers! Utilizes the climate for natural fresh air cooling all year round! Grand opening and serving traffic in june 2013
En ny industriera för Sverige och regionen After a rigorous review process of sites across Europe, we concluded that Luleå offered the best package of resources including a suitable climate for environmental cooling, clean power resources, available land, talented regional workforce and supportive business and corporate environment. Tom Furlong, VP of Site Operations at Facebook
Att i internationell konkurrens och under given tid skapa samhandling i komplexa system där aktörerna saknar formell makt över varandra.
En resa för investeringsfrämjandet i Norrbotten 2007 Hur ökar vi inflödet av etableringar? 2008 Invest in Luleå och Piteå (ICT) Svenskt erbjudande 2011 Facebook väljer Luleå
Nyheten om att Facebook valt Luleå gav minst 1500 artiklar, det största PR-genomslaget för Luleå och regionen någonsin, och ett momentum för Sverige som ledande ICT-nation.
Totalt 750 personer var på något sätt inblandade i byggnationen.
Sedan mars 2013 sysselsätts 79 heltidsanställda och ett 20-tal deltidsanställda.
Metoden Projektet är indelat i fyra insatsområden och tre verksamhetsnivåer (lokal, regional, nationell) enligt nedan. Insatsområdena är horisontella och inbegriper samtliga verksamhetsnivåer med delvis olika men samverkande aktiviteter. Insatsområdena består av: 1. Produktutveckling 2. Marknadsföring 3. Försäljning 4. Kundvård
Utmaningen Osäker riktning Ingen formell rådighet över erbjudandet Det finns ingen egentlig beställare Det saknas formellt mandat Ovan leveransorganisation Extrem tillväxt
Utmaningen Osäker riktning Ingen formell rådighet över erbjudandet Det finns ingen egentlig beställare Det saknas formellt mandat Ovan leveransorganisation Extrem tillväxt Lösningen Ett agilt projektformat en kunskapsresa Plan-Do-Check-Act Interaktion med presumtiva kunder källa till lärande för alla Förtjäna mandatet. Better done than perfect Förståelse för vilken bransch man jobbar i - Förtroendebranschen
The TSIC Network Asia & US
The TSIC Network Europe Luleå RTD 12.5ms RTD 25ms Nationwide coverage of both Sweden and Finland
En bra story för Facebook Facebooks rapport om energianvändning 2011 When we bring our Lulea, Sweden, data center online, we expect to see a steady increase in the clean and renewable sources powering our data center operations. And we ve set a company goal to derive at least 25% of our energy mix from clean and renewable sources by 2015. https://newsroom.fb.com/news/sharing-our-footprint-19c.aspx 2012-08-01 The Node Pole lanseras som den ideala platsen för datacenter i samband med Facebooks tillkännagivande.
Powerbalance in Norrbotten as of 2011 Mining industry Total Powerload 1850 MW 7-8 TWh/a Rest of the region 37 miles 650 MW 300 MW 700 MW Mining industry Pulp&Paper industry 200 MW Steel industry Pulp & Paper industry Data center industry Total production Hydropower 4300 MW 14-18 TWh/a Vindpower ~100 MW ~0,25 TWh/a Hoover Dam 2080 MW 4,8 TWh/a Until 2020 the powerload is expected to grow by 30% as a result of growing mining sectror and emerging datacenter operations in the region. The same period the installed windpower is expected to grow by factor 3-5.
The Node Pole Data Center Eco System Mega datacenter 2 Mega Datacenter 3 Mega Datacenter 4 Datacenter Enterprise Co-location DC
Design Electricity Facility Security Municipalities The Node Pole Construction Investors Goverment Equipment Fiber Operations
http:// www.computing.co.uk/ctg/ analysis/2297267/ facebooks-lule-datacentre-is-a-swedishmodel-of-efficiency
Mänskligheten har skapat 5 Exabyte data till 2003 Nästa år skapas 5 Exabyte var 10:e minut.. Source: http://www.emc.com
Digital agenda & DC infrastructure Konsument- tjänster Företags- tjänster Medborgar- tjänster Användartjänster Tjänste mjukvara, mobila och fasta terminaler Digitala agendan DC pla;ormar Server mjukvara, big data mjukvara, kontroll mjukvara DC Infrastruktur Hus, mark, kra0, fiber, kyla, server hårdvara
The Node Poles förebild är kluster som North Carolina, USA Source: www.five9sdigital.com Source: Google.com NORTH CAROLINA DATA CENTERS APPLE FACEBOOK GOOGLE TIME WARNER CABLE AMERICAN EXPRESS DACENTEC IBM DISNEY SOCIAL SECURITY ADMIN. ERICCSON SYNTHON CISCO EMC BED BATH & BEYOND WIPRO / INFOCROSSING AT&T
Vårt erbjudande: Välkommen till den idealiska platsen för datacenter
Siter för datacenter 1 Facebook Data Center Luleå Airport 16 daily flights to Stockholm Arlanda Airport + Gothenburg 1 daily flight Kallax Cargo Air freight Skelle0eå Airport with 6 daily flights to Stochkholm 5 3 Luleå University of Technology, Aurorum Science Park Luleå & Acusfcum Piteå 6 Data Center Sites 4 E4 97 Highways 2 1. Hydro Power, Luleå river, 4,2 TW/12,7 TWh/y 2. Hydro Power, Skelle0eå river, 1 TW/4,3 TWh/y 3. Hydro Power, Piteå River (environmentally protected) 50 MW/185 GWh/y 4. Bondön Wind Farm, 35 MW/87 GWh/y 5. Dragaliden Wind Farm, 24 MW/72 GWh/y + Svevind AB + Enercon planned Wind Farm of 1100 wind mills (RED). 6. Solar Power Pilot Plant
Thank you! Anders Granberg http://www.linkedin.com/in/granberganders