FD30/50 HRP SLIDING DOOR SYSTEM Installation Manual(Multiple Synchronized Sliding Door)

Relevanta dokument
FD50H SLIDING DOOR SYSTEM Installation Manual

FD30EX SLIDING DOOR SYSTEM Installation Manual

IMPORTANT! RETAIN FOR FUTURE REFERENCE PLEASE READ CAREFULLY VIKTIGT! BEHÅLL FÖR FRAMTIDA REFERENS LÄS IGENOM INSTRUKTIONSMANUALEN

81152 TRANSFER CASE SHIFT HANDLE

IMPORTANT! RETAIN FOR FUTURE REFERENCE PLEASE READ CAREFULLY VIKTIGT! BEHÅLL FÖR FRAMTIDA REFERENSLÄS IGENOM INSTRUKTIONSMANUALEN NOGGRANT

Installation Instructions

ARC 32. Tvättställsblandare/Basin Mixer. inr.se

BBT042/ BBC042/ BBCD042 NISSAN NAVARA D40 V STX & PATHFINDER R WD & 4WD Models

VASSVIK FIXED STAND SE / ENG

BBT057/ BBC057 BBCD057/ BBT057-NL HOLDEN COLORADO 9/2016+ HOLDEN TRAILBLAZER WD & 4WD Models

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS SCALE SQUARE - STANDARD

MY-HITE Beam Installation Manual

Nathi Skötbord Changing unit Table à langer murale Wickeltisch Verschoontafel Puslebord Cambiador de pared Přebalovací pult Fasciatoio

Verktyg som behövs. LX HD Sit-Stand Desk Mount LCD Arm SVENSKA. 20" (508 mm) lbs ( kg)

ASSEMBLY INSTRUCTIONS SCALE - SYSTEM

Montageanvisning Airway system 1000/1500 Assembly instruction Airway system 1000/1500

VASSVIK ROCKING STAND

LINC 23. Tvättställsblandare/Basin Mixer. inr.se A

Installation. Twice Nisch. Twice Corner SVENSKA ENGLISH

Windlass Control Panel v1.0.1

Support Manual HoistLocatel Electronic Locks

ASSEMBLY INSTRUCTIONS

P650 - Takscreen. Installationsguide EN

ASSEMBLY INSTRUCTIONS SCALE CIRCLE - STANDARD

Montageanvisning Airway system 1000/1500 Assembly instruction Airway system 1000/1500

DAMPER EQAZ-12, EQAZ-13, STAZ-30, STBZ-30

Bathtub Filler CN EN. TBP02201 Type / TBP02202 Type. Installation Manual. Continued on the back cover

Your No. 1 Workout. MANUAL pro

BBT014/ BBC014/ BBCD014 PJ & PK FORD RANGER WD & 4WD Models

Digital Personvåg MANUAL H

Plain A262. För T16 (T5) lysrör. Innehåll. Monteringsanvisning. A. Instruktion för rampmontering

TREX TRANSCEND RAILING

Contents / Innehållsförteckning

LINC Modell A

Monteringsanvisning Nödutrymningsbeslag ASSA 179E

Diskant Yta eller Vikelfäste montering Mount

LINC MODELL 13. INR SVERIGE AB Kosterögatan 15 SE Malmö 13 EN 1428:2005+A1:2008

BATH MIXER 160 LINC 21. incl. HAND SHOWER. inr.se

INKOPPLINGSANVISNING ELTRYCKSLÅS WIRING DIAGRAM SOLENOID LOCK

Installation manual for pool enclosure Installationsmanual för pooltak

Fiat » Fiat Panda / 4x4 2003» Fiat Panda 4x4 Climbing / 4x4 Cross 20033»

LX Desk Mount LCD Arm

Joki Joki Air. JCD70-xx JAD90-xx. lasiesta.com. Manual. Betriebsanleitung. Manuel. Manual. Manuale. Gebruiksaanwijzing.

Installation Instructions

LX Sit-Stand Desk Mount LCD Arm

VARIOBARRIER S/M MIMSAFE BY CHOICE

BBT034/ BBC034/ BBCD034 BBCD060/ BBT060-NL/ BB060-TL/ BB060-SL VOLKSWAGEN AMAROK

Users manual Bruksanvisning Gebrauchanweisung Guide d instructions

BBT034/ BBC034/ BBCD034 VOLKSWAGEN AMAROK. Ironman 4x4 BBT/ BBC/ BBCD034 Bull Bars fit to a Volkswagen Amarok. It will take about 3 hours to install.

Monteringsanvisning Podie T 4100 K

Klyvklingor / Ripping Blades.

FORTA M315. Installation. 218 mm.

Viktig information för transmittrar med option /A1 Gold-Plated Diaphragm

Z-LYFTEN PRODUKTION AB MONTERINGSANVISNING INSTALLATION INSTRUCTIONS

Varningssymboler Symbol Signalord Varningsnivå. Säkerhet. Impact Hazard! SVENSKA WARNING. För att informera användaren om säkerhetssituationer

Installation Instructions

Beijer Electronics AB 2000, MA00336A,

In Bloom CAL # 8, sista varv och ihopsättning / last rows and assemble

Svenska()(Bruksanvisning(för(handdukstork()(1400(x(250(mm(

LX Wall Mount Keyboard Arm

Z-LYFTEN PRODUKTION AB MONTERINGSANVISNING INSTALLATION INSTRUCTIONS

Quick Start. English Svenska PRIMACY. Printing settings and winsign

SAFETY PRECAUTIONS SPECIFICATIONS

Installation Instruction Monteringsinstruktion JK400

Rev No. Magnetic gripper 3

GB ASSEMBLY INSTRUCTION MANUAL SE MONTERINGSANVISNING DUNK YOUTH ART. NO

TEXTURED EASY LOCK BLOCK INSTALLATION GUIDE. australianpaving.com.au

Ringmaster RM3 - RM 5 RM3 RM 4 RM 5

Bruksanvisning Directions for use

Droppställning / IV stand

PRESS FÄLLKONSTRUKTION FOLDING INSTRUCTIONS

SUZUKI GRAND VITARA 3P CITY 2011»

Instruction Manual. Svenska, English. Power Bank. Model: PRBN

Reservdelskatalog Parts Catalogue COMBI 40 AE /S15 - Season 2017

Monteringsanvisning benfundament TM 8055, TM 8060, T 8118 K. Art nr ,

BBT025/ BBC025/ BBCD025 TOYOTA LANDCRUISER 200 SERIES

Accepterad monteringsanvisning 2016:1. Metris (RSK: ) Metris S (RSK: ) Metris (RSK: )

Anvisning för Guide for

»Bromma« Assembly instructions Monteringsanvisning GB SE. 1/10 Bromma

Installation Instructions

IRAB Mottagare sida 2-5 Tele Radio AB Mottagare sida 6

LÄNKHJUL S3. Monteringsanvisning för: Länkhjul S3

Active Speaker System X-Line 50 AW

2.1 Installation of driver using Internet Installation of driver from disk... 3

3HAC ABB Robotics. Figur 1. Separatoravdragare och separator. Assembly Instruction. Maintenance instruction. Underhållsinstruktion

»Bromma« Assembly instructions Monteringsanvisning GB SE. 1/11 Bromma

säkerhetsutrustning / SAFETY EQUIPMENT

POSH. Art.nr

Assembly instruction Kit 200

Installation Instructions

PRESS FÄLLKONSTRUKTION FOLDING INSTRUCTIONS

Metodprov för kontroll av svetsmutterförband Kontrollbestämmelse Method test for inspection of joints of weld nut Inspection specification

SkillGuide. Bruksanvisning. Svenska

RADIATION TEST REPORT. GAMMA: 30.45k, 59.05k, 118.8k/TM1019 Condition D

Boiler with heatpump / Värmepumpsberedare

Mitsubishi Montero io 10/1999» Pajero Pinin 3-5 platser

3 rd October 2017

Accepterad monteringsanvisning 2016:1. Focus (RSK: ) 1 (12)

Information technology Open Document Format for Office Applications (OpenDocument) v1.0 (ISO/IEC 26300:2006, IDT) SWEDISH STANDARDS INSTITUTE

Transkript:

FD0/0 HRP SLIDING DOOR SYSTEM Installation Manual(Multiple Synchronized Sliding Door) Part No.FD0HRP- FD0HRP- FD0HRP- FD0HRP- installing the, leave this manual to the owner so that the owner is able to use this manual to check the any time. The system may be FOR YOUR SAFETY WORK AND OPERATION symbol denotes warning and caution during work or operation. symbol denotes the item which should be avoided to keep safety. symbol denotes item which should be followed to avoid injury. If this item is not followed, injury may be resulted. Warning: If this warning is not followed, it may result in injury or damage. This sliding system should be installed by experienced person who has correct knowledge. If the system is not installed correctly, the will not operate smoothly, and or may cause injury. Do not try to use this product for any other purposes other than originally intended for. Do not disassemble the components for any do not take any responsibility for any damage, accident or injury occurring from an improper use, application or wrong installation. causing injury. IMPORTANT: This manual describes the installation methods considered most safe and effective to set up and install the sliding system. The installation procedures or methods can be changed to meet your working conditions or environments. In this manual, the dimensions are not considering margin of error or deformation of material. Therefore, please carry out each process such as cutting, taking care of deformation or other changes. - synchro - synchro Trailing edge Trailing edge Leading edge Leading edge Middle Leading edge Trailing edge Leading edge Trailing edge [] Middle

FD0-H Synchro Type INSTALLATION DRAWING (EXAMPLE) In order to prevent excessive movement at top end, provide a space to install steady rest. add necessary dimension. Process additional trigger mount hole, 4mm diameter Process additional trigger mount hole, 4mm diameter Rail length 4 Door pull (Optional) Open width in frame FW Open width RW Effective open width RO=RW-DN Margin DN Recommended screw Philips flush tapping screw. 0 Recommended screw Philips flush tapping screw. 0 9. Door thickness mm, when upper rail (for embed) is used. Door thickness 6 mm, when upper rail (for fascia) is used. Process dimension for operation and middle (- synchro) process dimension tail side 47 47 47 47 SPECIFICATIONS - synchro - synchro Middle The dimension in ( ) denotes dimension when installing face cap on upper roller.

- synchro Process additional trigger mount hole, 4 mm diameter Process additional trigger mount hole, 4 mm diameter 4 Rail length Process additional trigger mount hole, 4 mm diameter Door pull (Optional) Open width in frame FW Open width RW Effective open width RO=RW-DN Middle Margin DN Middle Recommended screw Philips flush tapping screw. 0 Middle Recommended screw Philips flush tapping screw. 0 Door thickness mm, when upper rail (for embed) is used. SPECIFICATIONS Door thickness 6 mm, when upper rail (for fascia) is used. Effective open width(ro) Door width (DW) Middle width width (DWC) (DW) Max. Door height (DH) Min. Door thickness (Dt) Max. Door weight Vertical adjustment Right-and-left adjustment FD0-H - synchro FD0-H - synchro 00 840 mm(when is fully closed, with no DN) 940 760 mm(when is not fully closed, with DN 80 mm) 40 760 mm(when is fully closed, with no DN) 70 680 mm(when is not fully closed, with DN 80 mm) The closing speed of the soft closing type may change due to ambient temperature, operating method or installation quality. COMPONENT PARTS FD0 - synchro for FD0-HRGU End stopper 90-000 mm 90-000 mm 0-000 mm 0-000 mm 400 mm 0-8 mm 0 kg 4 mm ± mm for FD0-HRDG Door guide ( mount) FD0-HBGF Door guide (wall mount) FD0-HRDB Brock for bottom guide FD0-HBDR000 Guide track FD0-HBB bumper block FD0-WRH-DSC FD0H-WRH-SC Dual soft closer soft closer FC0-WRH-N upper roller for dual soft closer FD0-TRG additional trigger FD0 upper rail exclusive for closer (for fascia or embed type) Cover cap 4 FD0 - synchro 6

FD0-H Synchro Type INSTALLATION DRAWING (EXAMPLE) In order to prevent excessive movement at top end, provide a space to install steady rest. Process trigger mount hole, φ Process trigger mount hole, φ DW+DN+ Process trigger mount hole, φ DW+DN-4 9. Jump-up protection nut: width across flat mm Rail length Rail hole pitch: 00 Door pull (Optional) Open width in frame FW Open width RW Effective open width RO=RW-DN Margin DN Philips flat head tapping screw 4 40 (attached to rail) Philips flat head tapping screw.8 40 (attached to rail) Door thickness mm, when upper rail (for embed) is used. Door thickness 6 mm, when upper rail (for fascia) is used. Process dimension for and middle (- synchro) 6 process dimension 6 tail side R 48 48 R 7 48 48 R DN+0 0 7 R 0 The dimension in ( ) denotes dimension when installing face cap on upper roller. 4

- synchro Process additional trigger mount hole, φ DW +DN+ DW+DN+ Process additional trigger mount hole, φ Two places in all 8 Process additional trigger mount hole, φ Process additional trigger mount hole, mm diameter Rail length 9. Jump-up protection nut: width across flat mm Rail hole pitch: 00 0 49 8. 48 Door pull (Optional) Open width in frame FW Open width RW Effective open width RO=RW-DN Middle Margin DN Middle Philips flat head tapping screw.8 40 (attached to rail) Middle Philips flat head tapping screw 4 40 (attached to rail) Door thickness mm, when upper rail (for embed) is used. Door thickness 6 mm, when upper rail (for fascia) is used. SPECIFICATIONS Effective open width(ro) Door width (DWDWCDW) Max. Door height (DH) Min. Door thickness (Dt) Max. Door weight Vertical adjustment Right-and-left adjustment FD0 - synchro FD0 - synchro The closing speed of the soft closing type may change due to ambient temperature, operating method or installation quality. COMPONENT PARTS 00 840 mm (When is fully closed, with no DN) 940 760 mm (When is not fully closed, with DN 80 mm) 40 760 mm (When is fully closed, with no DN) 70 680 mm (When is not fully closed, with DN 80 mm) 680-00 mm 680-00 mm 400 mm 0 8 mm 0 kg 4 mm ± mm for FD0-HRGU End stopper for FD0-HRDG Door guide ( mount) FD0-HBGF Door guide (wall mount) FD0-HRDB Brock for bottom guide FD0-HBRT00SIL Guide track FD0-HBB stopper block FD0-WRH-DSC FD0H-WRH-SC Dual soft closer Dual soft closer FD0-WRH upper roller FD0-TRG additional trigger FD0 TRM upper rail Cover cap FD0 - synchro 4 FD0 - synchro 4 6

PARTS LIST to, please refer to instruction manual attached to each part. Dimensional drawing Dimensional drawing <FD0> hole,φ.8 8 4 9. 0. 8 4.7 8. 6. 000 7 Finish Door guide guide 9 6 0 4 φ. φ9 CSK 80 0 40 4 φ.8 φ9 CSK 6 6 6 4 8 8 6 8 60 7 8.. 7 4 φ4. φ. φ0 9 7. Finish <FD0> 6.6 φ φ9 CSK Finish 4 0 4 4 0 ASSEMBLY Confirmation before assembly If any foreign matter such as cutting chips remain in the rail may impact the performance of roller and guide,and PROCEDURE. Cutting the rail Then, remove any cutting scrap from the rail. to prevent deformation of cut section. PREPARATION AND INSTALLATION. Hole processing FD0 - synchro If trigger is in the rail, this is head side. DW+04.+Unclosed DN φ4 FD0 - synchro φ4 DW-8+Unclosed DN φ4.8 φ7.8 CSK φ4.8 φ7.8 CSK FD0 - synchro hole,φ DW++Unclosed DN hole,φ FD0 - synchro DW-4+Unclosed DN hole,φ φ4. φ4. <FD0> DW+04.+Unclosed DN φ4 If trigger is in the rail, this is head side. DW +4.+Unclosed DN φ4 DW-8+Unclosed DN φ4.8 φ7.8 CSK φ4.8 φ7.8 CSK φ4 φ4.8 φ7.8 CSK DW-4+Unclosed DN hole,φ hole,φ φ4. DW++Unclosed DN φ4. hole,φ DW ++Unclosed DN hole,φ φ4.. Preparation of mounting parts to separate main body from casing. 4. Assembling Door guide Install guide block to Door guide plate, referring the Door thickness 0 4 8 Mark 6. Installing casing Firmly insert upper rollerr casing attached screws. Wide Narrow Narrow Wide 6

6. Assembling Guide track - synchro Door guide Door guide Door guide prepare screws separately. x The thin protrusion should be faced toward overlap. prepare screws separately. x - synchro: [] Mounting parts on operation - synchro: [] Mounting parts on operation Guide track length = width DW-60-length of not fully closed DN Guide track length = width DW-60-length of not fully closed DN - synchro: [] Mounting parts on last - synchro: [] Mounting parts on middle Guide track length = DW - 6 Middle Guide track length = DW 60 - synchro: [] Mounting parts on last the and parts to be parallel. with part corner. Door Align the corner Door Guide track length = DW 6 7

7. CONFIRMATION BEFORE INSTALLING THE DUAL SOFT CLOSER catcher Figure catcher Figure ϕ6 Correct set position Correct set position Figure If the closer is installed without conformation, it will cause 8. Installing parts and mounting upper rail x Leading side FD0 bumper block or FD0 stopper block FD0 soft closer or FD0 dual soft closerer Upper roller (main unit) Dual soft closerer Leading side - synchro FD0 bumper block or FD0 stopper block FD0 soft closer or FD0 dual soft closerer Upper roller (main unit) Dual soft closerer Upper rail Leading side and Upper rail Leading side and 9. Mounting trigger FD0 - synchro FD0 - synchro FD0 - synchro FD0 - synchro (additional) 0. Installing lower guide (additional) - synchro 4 install base plate of Door guide, using attached mount screws. Install guide block to guide plate to correct direction, as shown. Door thickness 0-4 - 8 Mark on part 6 upper rail center. guide to the position shown on the drawing. Fix it with attached screws. Wide Narrow NarrowWide Door () 9 8

PROCEDURE HANGING DOOR AND ADJUSTMENT.Installing s as shown below. Insert the guide into the bottom groove. Then, insert upper roller to the casing at both ends of upper part of. Inserting lower guide in bottom groove lower guide with groove under. Inserting upper roller (main unit) into upper casing upper roller until click sound is heard. Correct lever position - synchro Incorrect lever position is fully closed. If necessary, adjust position of bumper block and stopper block in the rail so that the position is [] position.door adjustment [] [] [] Middle [] Do not turn adjustment screw more than adjustment range. To avoid damage on the adjustment screw, do not use electric screwdriver. Vertical adjustment: 7 mm Left-to-right adjustment of ± mm close position - synchro - synchro Frame position block position position Correct position of bumper block and stopper block mm 4 mm Door Clockwise =Raise Counterclockwise=Lower In this case, adjust middle and last height to lower the slightly. 4.Fixing jump-up prevention nut Tighten dual soft closer and upper When vertical frame is not used Install stopper. When removing the roller main unit from the while raising the lever. Door stopper Tighten 9

PERIODICAL INSPECTION TROUBLESHOOTING Trouble Door stops during soft closing OPTIONAL PARTS (SOLD SEPARATELY) last. Install the trigger to correct position. operation Tighten the screw. Door does not move. Door starts to move. Dimensional Drawing Door stopper Door stopper to install for double sliding φ4φ8 CSK 4. 9 Ellipse hole metal 4. 9. Door stopper (9) 6.φ9. ellipse hole 0.φ4. Spot facing φ. Hole φ0. Spot facing Dimensional Drawing 4. 9.Ellipse hole 64 4 9 4 hole,φ4. 8 x 8 6 8 4. 9.Ellipse hole 64 6 8 4 9 4 hole,φ4. 8 Finish screws 0 8 9 nut of dual soft closer and upper roller. SUGATSUNE KOGYO CO.,LTD Tokyo, JAPAN Phone: +8 (0) 866 60E-mail:export@sugatsune.co.jp SUGATSUNE KOGYO (UK) LTD Reading, UK Phone: +44 8 97 9 E-mail:sales@sugatsune.co.uk SUGATSUNE EUROPE GmbH Dusseldorf, GERMANY Phone: +49 8900 E-mail:sales@sugatsune.eu 0 SUGATSUNE SHANGHAI Co., LTD Shanghai, CHINA Phone: +86 6 88 E-mail:lamp@sugatsune.com.cn Guangzhou, CHINA Phone: +86 0 669 E-mail:lamp@sugatsune.com.cn SUGATSUNE KOGYO INDIA PRIVATE LIMITED Mumbai, INDIA Phone: +9 84490/9E-mail:sales@sugatsune.in SUGATSUNE AMERICA, INC California, USA Phone: + 0 9 67E-mail:sales@sugatsune.com Chicago, USA Phone: + 46 08 SUGATSUNE CANADA, INC. Phone: + 4 67 E-mail:chicagoshowroom@sugatsune.com. E-mail:support@sugatsune.ca 07.04077-4